Laserfiche WebLink
21. All wetland areas or water bodies that are outside the specific limits of construction <br /> authorized by this permit must be protected from erosion, siltation, scouring or excess <br /> turbidity, and dewatering. <br /> 22. The operation and maintenance entity shall inspect the stormwater or surface water <br /> management system once within two years after the completion of construction and every <br /> two years thereafter to determine if the system is functioning as designed and permitted. <br /> The operation and maintenance entity must maintain a record of each required inspection, <br /> including the date of the inspection, the name and contact information of the inspector, and <br /> whether the system was functioning as designed and permitted, and make such record <br /> available for inspection upon request by the District during normal business hours. If at any <br /> time the system is not functioning as designed and permitted, then within 30 days the entity <br /> shall submit a report electronically or in writing to the District using Form 62-330.311(1), <br /> "Operation and Maintenance Inspection Certification," describing the remedial actions <br /> taken to resolve the failure or deviation. <br /> 23. The proposed project must be constructed and operated as per plans and calculations <br /> received by the District on July 12, 2018. <br /> 24. This permit supersedes permit number 42-061-40158-3 and the conditions of this permit <br /> now govern the project's construction, operation and maintenance. <br />