My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/02/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:42:57 PM
Creation date
11/26/2018 4:03:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/02/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract# IRL2018-01 <br />Encumbrance# GLO1-1707 <br />VINCITY MAP <br />WEST WABASSO PHASE 11 <br />SEPTIC TO SEWER <br />PROJECT LOCATION MAP T—s�" t <br />x� �: :I Vis° .r INDIAN RIVER 5 ':1 ,"I E <br />e <br />WEST WABASSO PHASE 2 fs�er I ! f ,s t •"4' - "�•" <br />"���• BOUNDARY � �.'[��� - + �(-' — �— <br />tr <br />Ile - <br />EXHIBIT A . PROJECT LOCATION MAI <br />IV. SCOPE OF WORK <br />The project is located south of CR -510 bounded to the west by 64 111 Avenue, 62"d Avenue to the <br />east, and 83' Street to the south. The project potentially will abandon 54 existing septic systems <br />and connect to centralized sewer, and provide sewer hookups for 47 vacant parcels for a total of <br />101 parcels. The project also includes construction of a gravity sewer system that will provide <br />connection to the 101 parcels. <br />V. PROJECT TASK IDENTIFICATION <br />The Recipient shall be responsible for the following: <br />• Complete and obtain final project design, construction plans, and specifications; <br />• Obtain all required permits, including right of access to the project sites, related to project <br />construction and subsequent operation and maintenance of the completed work; <br />• Assure compliance with all permits and permit conditions; <br />• Provide procurement for project construction; <br />• Perform supervision and inspection of construction; <br />• Perform construction contract administration; <br />• Assure compliance with cost accounting practices and procedures required for <br />reimbursement of cost share funds expended. <br />Page 11 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.