My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/02/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:42:57 PM
Creation date
11/26/2018 4:03:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/02/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Will 3rd Party contractors be used to fulfill this activity line item? <br />Yes, 3rd Party Contractors will be used for this line item. <br />Funding Source Section of CFDA Amount <br />Statute Number <br />5307 - Urbanized Area Formula Grants (2013 and 5307-2A 20507 $1,600,000 <br />forward) <br />Local $800,00.0 <br />Local/In-Kind $0 <br />State $800,000 <br />State/In-Kind $0 <br />Other Federal $0 <br />Transportation Development Credit $0 <br />Total Eligible Cost $3,200,000 <br />Milestone Name <br />Est. Completion Description <br />Date <br />RFP/IFB Issued <br />3/1/2018 <br />Contract Award <br />6/30/2018 <br />Contract Complete <br />6/30/2023 <br />Project Environmental Findings <br />Finding: Class II(c) - Categorical Exclusions (C -List) <br />Class Level Description <br />Class II(c) consists of projects called categorical exclusions (CEs) which are known not to have, either <br />individually or cumulatively, a significant environmental impact on the human or natural environment <br />and are therefore categorically excluded from the requirement to prepare an environmental <br />assessment or an environmental impact statement. Class 11(c) does not require documentation. <br />Categorical Exclusion Description <br />Type 04: Planning and administrative activities which do not involve or lead directly to construction, <br />such as: training, technical assistance and research; promulgation of rules, regulations, directives, or <br />program guidance; approval of project concepts; engineering; and operating assistance to transit <br />authorities to continue existing service or increase service to meet routine demand. <br />Date Description Date <br />Class 11c CE Approved <br />Scope Name / Code Line Item Line Item Name Quantity FTA Amount Total Eligible <br />Number Cost <br />OPERATING UP TO 50% <br />ASSISTANCE (300- 30.09.01 FEDERAL 0 $1,600,000.00 $3,200,000.00 <br />00) SHARE <br />150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.