My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/02/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:42:57 PM
Creation date
11/26/2018 4:03:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/02/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benefits <br />• Significantly reduces the damaging <br />freshwater flow from the C-25 to <br />the Indian River Lagoon. <br />• Net annual average water quantity <br />benefit up to 39,863 acre-feet <br />• Nutrient loads pumped out of C-25 <br />Canal. Estimated annual benefit: <br />• total Phosphorus: 6.7 metric tons <br />• Total Nitrogen: 25.3 metric tons <br />Costs <br />• Construction Period 6-9 <br />months: est. $2,500,000 <br />• Funded by SA159oA <br />• Operation Period (so years: <br />Year 1— zo: x5,894.,000 <br />• Relies solely on future <br />legislative funding <br />�)Oa <br />
The URL can be used to link to this page
Your browser does not support the video tag.