My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/02/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:42:57 PM
Creation date
11/26/2018 4:03:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/02/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley»>Horn <br />August 24, 2018 <br />David Kanarek <br />Land Development <br />Pulte Group, Inc. <br />4400 PGA Boulevard, Suite 700 <br />Palm Beach Gardens, FL 33410 <br />Re: The Lakes at Waterway Village — 58th Avenue Widening Project Extension <br />Indian River County, FL <br />Dear David: <br />Kimley-Horn and Associates, Inc. ("Ki ml ey- Horn" or "the Consultant') is pleased to submit this letter <br />agreement (the "Agreement') to Pulte Group, Inc. ("the Client') for providing professional consulting <br />services. Our project understanding, scope of services, schedule, and fee are below. <br />PROJECT UNDERSTANDING <br />It is our understanding that the Client wishes to expand the 58th Avenue Widening Project to include <br />development of final construction documents and obtain jurisdictional permits associated with <br />extending the widening 581h Avenue between 53rd Street and 57th Street. The 581h Avenue Widening is <br />understood to consist of reconstructing 58th Avenue from its current two-lane rural roadway to a four - <br />lane divided urban roadway with paved shoulders and pedestrian facilities between 53rd Street and 57th <br />Street. It is anticipated that additional right of way will be necessary to be acquired to facilitate the <br />proposed improvements. It is understood that the Client and/ or the County will provide the design <br />survey and geotechnical investigation by.others. <br />The terminal intersections are understood to be required to have the following improvements: <br />57th Street/ 58th Avenue — Expand intersection to ultimate four lane divided configuration and <br />add left turn lanes on all approaches. <br />The PROJECT LIMITS are projected to extend 3,500 feet along 58th Avenue. The replacement of the <br />58th Avenue bridge over the Indian River Farms Water Control District North Canal will be required. <br />Based upon this understanding, our proposed Scope of Services, Schedule and Fee are as follows: <br />1of10 <br />251 <br />
The URL can be used to link to this page
Your browser does not support the video tag.