Laserfiche WebLink
IRC PROJECT NO. IRC 758 <br />BLUE CYPRESS LAKE ROAD CULVERT REPLACEMENT <br />PAY APP NO. I <br />83 <br />M'" <br />m <br />"'r%W9wdwt. <br />MOBILIZATION <br />LS <br />7,S00.00 <br />7,10OCC <br />1.00 <br />7,500.00 <br />0.00 1.00 7,500.00 <br />200.00% <br />0.00 <br />0.00 <br />0.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />6,000.00 <br />6,000.00 <br />1.00 <br />6,000.00 <br />0.00 1.00 6,000.00 <br />100.00% <br />0.00 <br />0.D0 <br />0.00 <br />F,O, <br />104-1 <br />EROSION AND WATER POLLUTION CONTROL <br />1 <br />LS <br />$ 3,500.00 <br />3,500.00 <br />1.00 <br />3,500.00 <br />0.00 2.00 3,500.00 <br />100,00% <br />0.00 <br />0.00 <br />0.00 <br />110-1-1 <br />CLEARING & GRUBBING <br />1 <br />Ls <br />$ 4,000.00 <br />4,000.00 <br />1.00 <br />4,000.00 <br />0.00 1.00 4,000.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />M3 <br />112" ASPHALT MILLINGS <br />so <br />SY <br />$ 110.00 <br />5,500.00 <br />SO.oD <br />5,500.00 <br />O.DO 50.00 51500.00 <br />100.00-A <br />0.00 <br />O.OD <br />0.00 <br />334-1-13 <br />12' SP -12.5 SUPERPAVE ASPHALTIC CONCRETE <br />E- <br />SY <br />85.00 <br />51100.00 <br />52.00 <br />4,420.00 <br />O.Do 52.00 4,420.00 <br />86.67% <br />0.00 <br />9.00 <br />680.00 <br />121-70 <br />NON-EXCAVATABLE FLOWABLE FILL (125 PSI) <br />10 <br />CY <br />280.00 <br />2,80100 <br />12.00 <br />3,360.00 <br />0.00 12.00 3,360.00 <br />lzo.WA <br />0.00 <br />-2.00 <br />-560.00 <br />40G-4-2 <br />CONCRETE, CLASS IV, ENDWAUS <br />2 <br />EA <br />15,000.00 <br />30,000.00 <br />2.00 <br />30,000.00 <br />0.00 2.00 30,000.00 <br />100.00PA <br />0.00 <br />0.00 <br />0.00 <br />430-275-248 <br />PIPE CULVERT, OTHER SHAPE - EUP/ARCH, 38"x60 (RCP) <br />48 <br />LF <br />600.00 <br />28,800.00 <br />48.00 <br />28,800.00 <br />0.00 48.00 28,800.00 <br />IDD.00% <br />0.00 <br />0.00 <br />0.00 <br />455-133-2 <br />SHEET PILE- STEEL, TEMPORARY (AS NEEDED) <br />60 <br />LF <br />120.00 <br />7,200.00 <br />0.00 <br />0.00 0.00 0.00 <br />0.00% <br />0.00 <br />60.00 <br />'o <br />7,200.00 <br />*P-1 <br />BY PASS PUMP AND ASSOCIATED FITTINGS/HOSES, 12" <br />IMINIMUM <br />1 30 <br />DAY <br />$ 120.00 <br />""00 <br />0.00 <br />0.00 0.00 0.00 <br />0.00% <br />0.00 <br />3,1500.00 <br />MISCELLANEOUS <br />SUB TOTAL <br />104,000.00 <br />93,080.00 <br />0.00 93,080.00 <br />0.00 <br />L30.00 <br />10,920.00 <br />CONTINGENCY/FORCE ACCOUNT <br />=. <br />$ 72,000.00 <br />72,000.00 <br />- 0.00 <br />0.00 0.03 <br />0- <br />72,000.00 <br />7-7- F7 <br />TOTAL <br />176,000.001 <br />TOTAL <br />93,080,001 <br />TOTAL 0.00 TOTAL 93.080.00I <br />TOTAL <br />0.001 <br />TOTAL <br />82,920.00 <br />AMOUNT COMPLETED TO DATE <br />MATERIALS STORED TO DATE <br />SUB -TOTAL MATERIALS STORED AND COMPLETE TO DATE <br />RETAINAGE OF WORK COMPLETED AT 5% <br />TOTAL COMPLETED AND STORED LESS RETAINAGE <br />LESS PREVIOUS PAYMENT <br />AMOUNT DUE CONTRACTOR <br />$93,080.00 <br />MOO <br />$93,080.00 <br />$0.00 <br />$93,080.00 <br />$88,426.00 <br />$4,654.0 <br />83 <br />