|
IRG41VI5
<br />(CRSIO) 85TH STREET RIGHT TURN LANE EXTENSION AT 66TH AVENUE
<br />135
<br />SCHEDULEDVALUE
<br />PREVIOUS APPLICATION
<br />THIS PERIOD
<br />TOTAL COMPLETED
<br />%
<br />MATERIALS
<br />IBALANCETOFINISH
<br />Nem No.
<br />[ba -do IS,
<br />7-L
<br />� 6 �jMTffy �W�6,jf !bU�
<br />re low up" is w"OHOWS,
<br />UA
<br />joj-j
<br />MOBILIZATION
<br />IS
<br />1
<br />45,000.00
<br />45,000.00
<br />1.00
<br />45,000.00
<br />0.00
<br />0.00
<br />1.00 45,000.00
<br />100.001A
<br />o-oo
<br />0.00
<br />0.00
<br />102-1
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />i
<br />3933.60
<br />3,933.60
<br />too
<br />3,933.60
<br />0.00
<br />0.00
<br />LOO 3,933.60
<br />100.00%
<br />0.130
<br />0.00
<br />0.00
<br />104=10=3
<br />SEDIMENT BARRIER
<br />LF
<br />420
<br />1.50
<br />630.00
<br />420.00
<br />630.00
<br />0.00
<br />0,00
<br />420.00 630.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />110-1-1
<br />CLEARING AND GRUBBING
<br />IS
<br />1
<br />83100
<br />83LOO
<br />1.00
<br />83LOO
<br />0.00
<br />0.00
<br />too 83LOO
<br />100.00%
<br />0.00
<br />0.00
<br />0,00
<br />120-1
<br />REGULAR EXCAVATION
<br />LS
<br />I
<br />6 500.00
<br />6,500.00
<br />too
<br />6,500.00
<br />0.00
<br />0.00
<br />1 LOD 6500.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />220-6
<br />IEMBANKMENT
<br />IS
<br />1
<br />2,118.00 1
<br />2,118.00
<br />1.00
<br />2,218.00
<br />0.00
<br />0.00
<br />1.00 1 2128.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />285-706
<br />14"CEMENTED COQUINA%1IDU!6 UBR 100 (2LIFTS)
<br />SY
<br />956
<br />15.65
<br />14,961.40
<br />956.00
<br />14,961AO
<br />0.00
<br />0.00
<br />956.00 14,961.40
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />327-70w6
<br />MILLING EXISTING ASPHALTICPAVEMENT (AVE. 1-1/2-
<br />'T
<br />DEPTH)
<br />SY
<br />441
<br />11.50
<br />5,07L50
<br />44100
<br />5,071.50
<br />0.00
<br />0.00
<br />44LOO 5,071.50
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />334-143
<br />SUPERPAVE ASPHALTCONREIE TRAFFIC CLS
<br />SY
<br />0
<br />9.12
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00 0.00
<br />#DIV/01
<br />0.00
<br />0.00
<br />0.00
<br />337-7-83A
<br />MF'!9�SLl":THK
<br />ASPHALT CONRETE FRICTION COURSE 'C (F, 175)1-
<br />1/2"THK
<br />SY
<br />0
<br />16.11_
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />O.Do 0.00
<br />#DIV/O!
<br />0.00
<br />0.00
<br />0.00
<br />337-7-83
<br />ASPHALT CONRETE FRICTION COURSE TRAFFIC C (FC12.5)0"-
<br />2" OVERBUILD
<br />SY
<br />0
<br />20.73
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00 0.00
<br />#DIV/01
<br />0.00
<br />0.00
<br />0.00
<br />520-1-10
<br />CONCRETE CURB AND GUTTER (TYPE F)
<br />LF
<br />415
<br />14.00
<br />5,810.00
<br />415.00
<br />5,810.00
<br />0.00
<br />0.00
<br />415.00 5,810.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />55040-221
<br />FENCING TYPE B. 5.1'-6.0- WITH BARBED WIRE,
<br />LF
<br />0
<br />39.33
<br />0-00
<br />.-Do
<br />"'Do
<br />Do.
<br />-.Do
<br />---o 0-
<br />"Dwol
<br />0.00
<br />0.00
<br />0.00
<br />570-1-2
<br />PERFORMANCE TURF, SOD (BAHIA)
<br />SY
<br />so
<br />6.00
<br />300.00
<br />50.00
<br />2100L00
<br />0.00
<br />0.00
<br />50.00 300.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />_
<br />700=1-50
<br />SINGLE POST SIGN, RELOCATE
<br />AS
<br />2
<br />137.50
<br />275.00
<br />2.00
<br />275.00
<br />0.00
<br />0.00
<br />2.00 275.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />711-11-102
<br />THERMOPLASTIC, PAVEMENT MARKINGS, STANDARD SOLID
<br />WHITES"
<br />LF
<br />20
<br />1.16
<br />23.20
<br />20.00
<br />23.20
<br />0.00
<br />0.00
<br />20.00 23.20
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />711-11-124
<br />THERMOPLASTIC, PAVEMENT MARKINGS, STANDARD SOLID
<br />WHITE 18" FOR DIAGONAL OR CHEVRONS
<br />LF
<br />20
<br />2.64
<br />52.80
<br />20.00
<br />52.90
<br />0.00
<br />0.00
<br />20.010 52-80
<br />100.00-A
<br />0.00
<br />0.00
<br />0.00
<br />711ml1-170
<br />THERMOPLASTIC, PAVEMENT MARKINGS STANDARD, SOLID
<br />WHITEARROWS
<br />EA
<br />6
<br />82.50
<br />495.00
<br />6.00
<br />495.00
<br />0.00
<br />0.00
<br />6.00 495.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />711-16-101
<br />THERMOPLASTIC, PAVEMENT MARKINGS, STANDARD, SOLID
<br />WHITE V
<br />Lf
<br />1327
<br />088
<br />1,167.76
<br />1,327.00
<br />1,167.76
<br />0.00
<br />0.00
<br />1,327.00 1,167.76
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />711-16-131
<br />THERMOPLASTIC, PAVEMENT MARKINGS, STANDARD, SKIP,
<br />WHITE, 6"10'30'
<br />LF
<br />150
<br />0.38
<br />57.00
<br />150.00
<br />57.00
<br />0.00
<br />0.00
<br />150.00 57.00
<br />100.001A
<br />0.00
<br />0.00
<br />0.00
<br />999-1
<br />AS -BUILT DRAWING (BY REGISTERED SURVEYOR)
<br />IS
<br />1
<br />2,170.00
<br />2,970.00
<br />-oo
<br />2,970.00
<br />0.00
<br />0.00
<br />1.00 7,970.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />90,196.26
<br />90,196.26
<br />0.00
<br />90,19626
<br />0.00
<br />0.00
<br />FORCEACCOUNT
<br />LS
<br />1
<br />30,000.00
<br />23,290.27
<br />0.00
<br />0.D0
<br />0.00
<br />0.00%
<br />0.00
<br />LOD
<br />23,290.27
<br />WCD 1
<br />NET AMOUNT FORCEACCOUNT DECREASED
<br />1
<br />6,709.73
<br />6,709.73
<br />0.00
<br />0.00 0.00
<br />0.00%
<br />0.00
<br />1.00
<br />6,709.73
<br />WcDi
<br />SP -12.5 (TRAFFIC C) 1.5-
<br />SY
<br />895
<br />11.89
<br />10,642.55
<br />895.00
<br />10,641.55
<br />0.00
<br />0.00
<br />895.00 10,641.55
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />WCD 1
<br />FC -9.5 (TRAFFIC C) 1-
<br />SY
<br />1348
<br />17.64
<br />23,778.72
<br />1,348.00
<br />23,778.72
<br />0.00
<br />0.00
<br />1-1148.00 23,778.72
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />WCD I
<br />SAWCUT EXISTING ASPHALT
<br />LF
<br />415
<br />3.00
<br />1,245.00
<br />415.00
<br />1,245.00
<br />0.00
<br />0.00
<br />415.00 2,245.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />WcDl
<br />REMOVE & DISPOSE OF EXISTING ASPHALT& BASE
<br />SY
<br />185
<br />7.00
<br />1,295.00
<br />185.00
<br />1,295.00
<br />0.00
<br />0.00
<br />185.00 1,295.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />WCDI
<br />CONCRETE FLUME
<br />EA
<br />1
<br />287.50
<br />287.50
<br />too
<br />287.50
<br />0.00
<br />0.00
<br />1.00 297.50
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />WCD 1
<br />RIGHT LANE MUSTTURN RIGHTSIGN
<br />EA
<br />1
<br />282.00
<br />282.00
<br />1.00
<br />292.00
<br />0.00
<br />0.00
<br />2.00 282.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />MISCELLANEOUS
<br />SUBTOTAL
<br />37,529.77
<br />37,529.77
<br />0.00
<br />37,529.77
<br />0.00
<br />30,000.00
<br />ITOTAL
<br />151,016.301
<br />TOTAL
<br />227,726A3
<br />TOTAL
<br />. .. . .......
<br />0.001 TOTAL 127,7Z6 013
<br />TOTAL
<br />0.001
<br />TOTAL
<br />30,000.00
<br />AMOUNT COMPLETED TO DATE
<br />MATERIALS STORED TO DATE
<br />SUB -TOTAL MATERIALS STORED AND COMPLETE TO DATE
<br />RETAINAGE OF WORK COMPLETED AT ()%
<br />TOTAL COMPLETED AND STORED LESS RETAINAGE
<br />LESS PREVIOUS PAYMENT
<br />AMOUNT DUE CONTRACTOR
<br />$127,726.03
<br />$0.00
<br />$127,7Z6.03
<br />$0.00
<br />$127,726.03
<br />$121,339.73
<br />$6-386.30
<br />135
<br />
|