My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-267
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:54:12 PM
Creation date
12/7/2018 12:32:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/04/2018
Control Number
2018-267
Agenda Item Number
8.I. (5 of 7)
Entity Name
GFA International
Subject
Geotechnical Engineering Services
Project Number
RFQ 2018042 IRC-1812
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Windsor probe: <br />EquipmentFee................................................................................................................. $135.00/day <br />Charges per set of 3 shots.................................................................................................. $75.00/set <br />Staff Engineer/ Senior Technician Field time................................................................ $80.00/hr. <br />ASPHALT FIELD INSPECTION, SAMPLING AND LABORATORY TESTING <br />Pavement Cores for thickness verification, base thickness & subbase description <br />Mobilization...................................................................................................................... $100.00/day <br />CoreMachine................................................................................................................... <br />$150.00/day <br />Generator............................................................................................................................ <br />$50.00/day <br />Technician time (2 man crew).................................................................................. <br />$60.00/man-hr. <br />Diamond bit wear - per inch diameter per inch of depth ........................................... <br />$0.35/in/in <br />Flag men and barricades if needed for safety and M.O. T .................................. <br />$60.00/hr./man <br />Roadway Senior Field Technician...............................................................................................$80.00/hour <br />ProjectManager................................................................................................................. <br />Laboratory Testing Services <br />Project Engineer(P.E.)..................................................................................................... <br />Unit weight of cores...................................................................................:......................$35.00/core <br />StaffEngineer...................................................................................................................... <br />Marshall Stability & Flow................................................................................................ <br />$200.00/test <br />Extraction and gradation tests........................................................................................ <br />$200.00/test <br />STRUCTURAL STEEL <br />Bolted connections <br />ProjectEngineer............................................................................................................... <br />$105.00/hr. <br />Sr. Engineering Technician................................................................................................ <br />$65.00/hr. <br />Licensed Building Inspector.............................................................................................. <br />$80.00/hr. <br />Field inspection of steel reinforcement placement <br />Principal Engineer(P.E.).................................................................................................. <br />$175.00/hr. <br />Senior Project Engineer (P.E.)........................................................................................ <br />$150.00/hr. <br />ProjectManager................................................................................................................. <br />$125.00/hr. <br />Project Engineer(P.E.)..................................................................................................... <br />$110.00/hr. <br />StaffEngineer...................................................................................................................... <br />$80.00/hr. <br />Senior Roadway Field Technician..................................................................................... <br />$80.00/hr. <br />Senior Engineering Technician......................................................................................... <br />$65.00/hr. <br />Engineering Technician...................................................................................................... <br />$60.00/hr. <br />Licensed Building Inspector............................................................................................... <br />$80.00/hr. <br />02018 GFA International, Inc. All Rights Reserved. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.