My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-267
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:54:12 PM
Creation date
12/7/2018 12:32:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/04/2018
Control Number
2018-267
Agenda Item Number
8.I. (5 of 7)
Entity Name
GFA International
Subject
Geotechnical Engineering Services
Project Number
RFQ 2018042 IRC-1812
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Samulin-a: <br />Installation of piezometers and observation wells; 2" Diam PVC (0 to 50 feet) .................$35.00/Foot <br />Permanent Groundwater Monitoring Wells of polluted soil and groundwater (2" Diam PVC) <br />- From surface to depts. Of 50 feet................................................................................................. $50.00 /Foot <br />Protective well covers, vads and manholes ...............................................$250.00/Well <br />Subsurface Permeability Tests: <br />SFWMD Exfiltration test............................................................................................................. $400.00/test <br />Borehole Permeability test............................................................................................................ $400.00/test <br />Double Ring Infiltrometer test.................................................................................................... $500.00/test <br />• ENGINEERING SERVICES • <br />Inspection of construction procedures, data evaluation, engineering analyses, and report preparation <br />PrincipalEngineer (P.E.)............................................................................................................... $175.00/hr. <br />Senior Project Engineer(P.E.)...................................................................................................... $150.00/hr. <br />ProjectManager.............................................................................................................................. $125.00/hr. <br />Project Engineer (P.E.).................................................................................................................. $110.00/11r. <br />Senior Roadway Field Technician.................................................................................................. $80.00/11r. <br />Engineering Technician....................................................................................:............................. $59.00/hr. <br />Administrative Personnel (Cadd/Admin Assistant)..............................................$50.00/hr. <br />Hourly Rate is to include all reimbursable expenses, including travel, meals, copies, <br />deliverables and so forth. Hourly rate is to be calculated as time on the job only, no travel <br />time shall be included or paid. Overtime is 1.5 times the hourly rates provided <br />02018 GFA International, Inc. All Rights Reserved. <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.