Laserfiche WebLink
5 <br /> Stantec Consulting Services Inc. <br /> 7370 Cabot Court,B-103,Suite A,Melbourne,FL 32940 <br /> November 15, 2018 <br /> Attention: James Gray, Jr., Coastal Engineer <br /> Indian River County <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> 772-226-1344 <br /> Reference: Indian River County Beach Preservation Plan 2019 Update- <br /> Scope/Fee Proposal <br /> Mr..Gray, <br /> Stantec Consulting Services Inc. is pleased to provide professional consulting and coastal <br /> engineering services to support Indian River County by performing an update to the <br /> County's Beach Preservation Plan (BPP) for 2019, which was originally produced in 1988, <br /> with subsequent updates in 1998, 2002, 2008, and 2015. The BPP is the principal document <br /> utilized to evaluate and maintain the resources along the coastline under the County's <br /> Coastal Restoration Program (Program). This proposal outlines the scope of work for <br /> Stantec to complete the 2019 update on behalf of Indian River County. <br /> BPP Update Report Intent and Layout <br /> The purpose of the 2019 update to the BPP is to support the County in managing its <br /> beaches, analyze recent storm events, assess risk along the coast, and document the <br /> overall program performance. The report will discuss resiliency elements that include <br /> discussions regarding beach management strategies, coastal vulnerability, seasonality of <br /> the beach sediments and provide new ideas on beach profile designs to promote natural <br /> recovery. <br /> This update to the BPP will be developed to provide a more comprehensive summary then <br /> the previous update. The report will be written in a manner intended for multiple audiences <br /> and the general public consumption. The main body of the report will be prepared with <br /> this consideration. Any items that are more technical in nature, analyses completed, or <br /> background data will be referenced in an appendix. <br /> Scope of Work <br /> Task 1: Beach Conditions Update <br /> Stantec will analyze shoreline and volumetric change conditions based on the latest <br /> available survey data from the County. The 2015 BPP analyzed shoreline and volumetric <br /> changes for time periods (1972 to 1986, 1986 to 2005, and 2002 to 2013).This analysis will be <br /> extended through to 2019 to include the winter 2019 and summer 2019 survey data, if <br /> available. The depth of closure will be evaluated on a line by line (FDEP R-monument <br /> beach profile) basis before developing an average depth of closure. The impact of <br /> W (< 1 / :. <br />