Laserfiche WebLink
T it A <br />Stantec Consulting Services Inc. <br />1. ` a n".�l C 7370 Cabot Court, B-103, Suite A, Melbourne, FL 32940 <br />November 15, 2018 <br />Attention: James Gray, Jr., Coastal Engineer <br />Indian River County <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />772-226-1344 <br />Reference: Indian River County Beach Preservation Plan 2019 Update - <br />Scope/Fee Proposal <br />Mr. Gray, <br />Stantec Consulting Services Inc. is pleased to provide professional consulting and coastal <br />engineering services to support Indian River County by performing an update to the <br />County's Beach Preservation Plan (BPP) for 2019, which was originally produced in 1988, <br />with subsequent updates in 1998, 2002, 2008, and 2015. The BPP is the principal document <br />utilized to evaluate and maintain the resources along the coastline under the County's <br />Coastal Restoration Program (Program). This proposal outlines the scope of work for <br />Stantec to complete the 2019 update on behalf of Indian River County. <br />BPP Update Report Intent and Layout <br />The purpose of the 2019 update to the BPP is to support the County in managing its <br />beaches, analyze recent storm events, assess risk along the coast, and document the <br />overall program performance. The report will discuss resiliency elements that include <br />discussions regarding beach management strategies, coastal vulnerability, seasonality of <br />the beach sediments and provide new ideas on beach profile designs to promote natural <br />recovery. <br />This update to the BPP will be developed to provide a more comprehensive summary then <br />the previous update. The report will be written in a manner intended for multiple audiences <br />and the general public consumption. The main body of the report will be prepared with <br />this consideration. Any items that are more technical in nature, analyses completed, or <br />background data will be referenced in an appendix. <br />Scope of Work <br />Task 1: Beach Conditions Update <br />Stantec will analyze shoreline and volumetric change conditions based on the latest <br />available survey data from the County. The 2015 BPP analyzed shoreline and volumetric <br />changes for time periods (1972 to 1986, 1986 to 2005, and 2002 to 2013). This analysis will be <br />extended through to 2019 to include the winter 2019 and summer 2019 survey data, if <br />available. The depth of closure will be evaluated on a line by line (FDEP R -monument <br />beach profile) basis before developing an average depth of closure. The impact of <br />