Laserfiche WebLink
November 15, 2018 <br />Page 7 of 7 <br />■ It is assumed that all base information, design documents, engineering calculations <br />and previous as-builts for beach projects will be provided to Stantec by the County. <br />■ Relevant information/data/documentation will be provided to Stantec by the <br />County in a timely manner. <br />■ Any delays in delivery of the data collected by others will result in adjustments to the <br />overall schedule without penalty to Stantec. <br />■ This scope does not include any field data collection. All data used will be from <br />existing information/sources. <br />■ No permitting is included in this scope of work. <br />■ No economic assessment/study or cost/benefit analysis calculations are included. <br />Only a planning level cost estimate will be provided. <br />■ This scope of work does not include costs to prepare additional documentation, <br />respond to or modify the work product based on legal challenges or third -party <br />peer review requests. It is assumed any costs associated with this type of request <br />will be paid for under a separate scope of work. <br />■ Only items listed in the scope are included in the associated fee schedule. <br />■ Additional services will be provided under a separate scope and fee schedule. <br />We thank you for the opportunity to provide professional services for this project and look <br />forward to working with Indian River County. We are prepared to begin work on this <br />assignment as soon as you direct us to proceed. <br />Regards, <br />Tabar, PE, D.CE <br />PriniEp6l <br />US Coastal Lead/Senior Coastal Engineer <br />Phone: (410) 443-2061 <br />Jeff.Tabar@stantec.com <br />Matthew S. Starr, PG <br />Associate <br />SE Coastal Team Leader <br />Phone: (239) 315-6208 <br />Matthew.Starr@stantec.com <br />