My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 11:55:12 AM
Creation date
12/14/2018 2:11:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br />FROM: Andy P. Sobczak, Infrastructure Project Manager <br />SUBJECT: Award of Bid No: 2019005 <br />Victor Hart Sr. Complex Drainage Improvements <br />DATE: September 28, 2018 <br />DESCRIPTION AND CONDITIONS <br />On February 6, 2018, the Board of County Commissioners approved Work Order No. 4 with Masteller <br />& Moler, Inc. for the design of drainage improvements to the existing football field and associated <br />parking areas at the Victor Hart Sr. Complex located at 4715 43rd Avenue. <br />Following completion of the design, the project was advertised and a bid opening was held on <br />September 19, 2018. Six (6) qualified bids were received for the project, a detailed bid tabulation is <br />on file and available for viewing in the County Engineering Division. The successful bidders and their <br />respective bids are as follows: <br />1) Guettler Brothers Construction, LLC <br />$591,143.00 <br />2) Sunshine Land Design, INC. <br />$689,007.83 <br />3) Blue Goose Construction, LLC <br />$733,937.50 <br />4) Summit Construction of Vero Beach, LLC <br />$747,241.30* <br />5) Joebear Contracting, INC. <br />$767,976.80 <br />6) PRP Construction Group, LLC <br />$769,047.25 <br />*Denotes mathematical rounding error corrected on bid. <br />Guettler Brothers Construction, LLC is considered to bethe lowest, responsive, responsible bidderfor <br />the project with a bid of $591,143.00. Guettler Brothers Construction, LLC has satisfactorily <br />completed similar construction projects for the County. Guettler Brothers Construction, LLC's bid was <br />$2,354.97 above the Engineer's estimate of $588,788.03. <br />FUNDING <br />Funding is budgeted and available in Optional Sales Tax/Parks/Victor Hart Parking/Drainage <br />Improvements—Account No. 31521072-066510-18005 in the amount of $591,143.00. <br />146 <br />C:\Users\Iegistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@800C453B\@BCL@800C453B.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.