|
Bid No. 2019005/IRC-1760
<br />shall be for the same purpose, and be for the same amount and subject to the same conditions
<br />as those applicable to the bond otherwise required. The determination of the value of an
<br />alternative form of security shall be made by the OWNER.
<br />B. Such Bond shall continue in effect for one (1) year after acceptance of the Work by theOWNER.
<br />C. The OWNER shall record the Public Construction Bond with the Public Record Section of the
<br />Indian River County Courthouse located at 200016th Avenue, Vero Beach, Florida 32960.
<br />ARTICLE 7 INDEMNIFICATION
<br />7.01 CONTRACTOR shall indemnify and hold harmless the OWNER, and its commissioners, officers,
<br />employees, and agents, from liabilities, damages, losses and costs, including, but not limited to,
<br />reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional
<br />wrongful misconduct of the CONTRACTOR and persons employed or utilized by the CONTRACTOR in
<br />the performance of the Work.
<br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br />8:1 In order toinduceOWNER o enter into this Agreemei
<br />representations:
<br />A. CONTRA
<br />AC
<br />ha� examined \and\carefully,studed the
<br />data identified in the Invitation to Bid documents.
<br />1j I I � � I
<br />B! CONTACTOR h�s visited the Site`and become familiar
<br />and Site conditions that may�affect,cost, progress, and
<br />C.�CONTRACTOR is familiar Jithl and is satisfied as'tolall fe
<br />S � � u �
<br />NT� OR ma es the followiri9
<br />ract Documents er and the othrelated
<br />and is satisfied as to the general, I� ocal,
<br />rmance of the Wor, k.
<br />I, state, and local Laws and Regulations
<br />that may affect cost, progress, and performance of the Work.
<br />D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all
<br />additional or supplementary examinations, investigations, explorations, tests, studies, and data
<br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site
<br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the
<br />means, methods, techniques, sequences, and procedures of construction to be employed by
<br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and
<br />procedures of construction, if any, expressly required by the Contract Documents to be employed
<br />by CONTRACTOR, and safety precautions and programs incident thereto.
<br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests,
<br />studies, or data are necessary for the performance of the Work at the Contract Price, within the
<br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
<br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the
<br />Site that relates to the Work as indicated in the Contract Documents.
<br />151
<br />
|