Laserfiche WebLink
Bid No. 2019005/IRC-1760 <br />shall be for the same purpose, and be for the same amount and subject to the same conditions <br />as those applicable to the bond otherwise required. The determination of the value of an <br />alternative form of security shall be made by the OWNER. <br />B. Such Bond shall continue in effect for one (1) year after acceptance of the Work by theOWNER. <br />C. The OWNER shall record the Public Construction Bond with the Public Record Section of the <br />Indian River County Courthouse located at 200016th Avenue, Vero Beach, Florida 32960. <br />ARTICLE 7 INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify and hold harmless the OWNER, and its commissioners, officers, <br />employees, and agents, from liabilities, damages, losses and costs, including, but not limited to, <br />reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional <br />wrongful misconduct of the CONTRACTOR and persons employed or utilized by the CONTRACTOR in <br />the performance of the Work. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8:1 In order toinduceOWNER o enter into this Agreemei <br />representations: <br />A. CONTRA <br />AC <br />ha� examined \and\carefully,studed the <br />data identified in the Invitation to Bid documents. <br />1j I I � � I <br />B! CONTACTOR h�s visited the Site`and become familiar <br />and Site conditions that may�affect,cost, progress, and <br />C.�CONTRACTOR is familiar Jithl and is satisfied as'tolall fe <br />S � � u � <br />NT� OR ma es the followiri9 <br />ract Documents er and the othrelated <br />and is satisfied as to the general, I� ocal, <br />rmance of the Wor, k. <br />I, state, and local Laws and Regulations <br />that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br />means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the <br />Site that relates to the Work as indicated in the Contract Documents. <br />151 <br />