Laserfiche WebLink
BUILDINGS AAND B ROOF REPLACEMENT PAY APP NO. 5 <br />PROJECT NO. <br />IRC -1715 <br />0 <br />55 <br />SCHEDULED VALUE <br />PREVIOUS APPLICATION <br />THIS PERIOD TOTAL COMPLETED <br />% <br />MATERIALS <br />BALANCE TO FINISH <br />nam wo. <br />QAP-0-051 �', 4PPL, TV <br />T11*xW--1',i, <br />A, Mike" <br />I <br />Building W install new standing seam roof system - provided per <br />plans set <br />1 <br />LS <br />662,855.00 <br />662,855.00 <br />1.00 <br />662,855.00 <br />IDO 662,855.00 <br />200.00-A <br />0.00 <br />0.00 <br />0.00 <br />2 <br />Building "A" replace existing nallbase insulation with a Minimum two <br />layers of 1.1s polyfso boards (minimum R-20) <br />53,213 <br />SF <br />4.35 <br />231,476.55 <br />53,213.00 <br />231,476.55 <br />53,213.00 231,476.55 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />3 <br />Building "A' repair damaged and mated steel decking (16 CA) <br />2.000 <br />SF <br />12.51) <br />25,000.00 <br />0.00 <br />0100 <br />0.00 0.00 <br />0.00% <br />0.4110 <br />2,00D.D0 <br />25,000.00 <br />4 <br />Building "B" install newidarding seam roof system -provided per <br />Plans set <br />I <br />LS <br />581.670.00 <br />581,670.00 <br />LOO <br />591,670.00 <br />LOO 581,670.00 <br />200.00% <br />0.00 <br />0.00 <br />0.00 <br />5 <br />Building "B" replace misting failbase insulation boards with a <br />rnirlmum� layers of 10 polylso, boards (minimum R-20) <br />46,131 <br />SF <br />4.35 <br />200,669.85 <br />46,131.00 <br />200,669.85 <br />46,131.00 200,669.85 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />6 <br />Building 'Er repair damaged and rusted steel docking (16G4.) <br />2... <br />F <br />12.60 <br />25,000.00 <br />0.00 <br />0.00 <br />0.00 0.00 <br />0.00% <br />0.00 <br />2,000.00 <br />25,000.00 <br />7 <br />Replace damaged or deteriorated mod blocIdna <br />BF <br />Z.. <br />3,000.()0 <br />1,500.00 <br />3,000.00 <br />1,500.00 3,000.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />FORCE ACCOUNT <br />SUBTOTAL <br />Im <br />SUBTOTAL <br />1,729,67L40 <br />41,475.20 <br />SUBTOTAL <br />2,679,67L40 <br />SUBTOTAL 0.00 SUBTOTAL 1,679,671.40 <br />SUBTOTAL <br />Ill <br />SUBTOTAL <br />50,000.00 <br />41,475.20 <br />wcol <br />Wiry & Generator roofs <br />I <br />LS <br />26,300.00 <br />26,300.00 <br />1.00 <br />26,300.00 <br />LOO 25,300.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />WCD2 <br />Additional Footage <br />1 <br />LS <br />32.224.00 <br />32,224.80 <br />LDO <br />32,224.80 <br />1.00 32,224.90 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />TOTAL <br />TOTAL <br />1,829 671.40 <br />TOTAL <br />1,738,296.20 <br />TOTAL 0.00 TOTAL 1,738,196.20 <br />TOTAL <br />0.00 <br />TOTAL <br />91A75.20 <br />AMOUNT COMPLETED TO DATE <br />MATERIALS STORED TO DATE <br />SUB -TOTAL MATERIALS STORED AND COMPLETE TO DATE <br />RETAINAGE OF WORK COMPLETED AT S% <br />TOTAL COMPLETED AND STORED LESS RETAINAGE <br />LESS PREVIOUS PAYMENT <br />AMOUNT DUE CONTRACTOR <br />$1,738,196.20 <br />$2,736,1%.20 <br />$0.00 <br />$1,738,196.20 <br />$1165IX6.39 <br />$96,90.81 <br />0 <br />55 <br />