My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equal to the time lost due to such delay shall be <br />CONTRACTOR's sole and exclusive remedy for such <br />delay. <br />12.06 Delay Damages <br />A. In no event shall OWNER or ENGINEER be <br />liable to CONTRACTOR, any Subcontractor, any <br />Supplier, or any other person or organization, or to any <br />surety for or employee or agent of any of them, for <br />damages arising out of or resulting from: <br />1. delays caused by or within the control <br />of CONTRACTOR; or <br />2. delays beyond the control of both <br />OWNER and CONTRACTOR including but not <br />limited to fires, floods, epidemics, abnormal <br />weather conditions, acts of God, or acts or <br />neglect by utility owners or other contractors <br />performing other work as contemplated by <br />Article 7. <br />B. Nothing in this paragraph 12.06 bars a <br />change in Contract Price pursuant to this Article 12 to <br />compensate CONTRACTOR due to delay, <br />interference, or disruption directly attributable to <br />actions or inactions of OWNER or anyone for whom <br />OWNER is responsible. <br />ARTICLE 13 - TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br />13.01 Notice of Defects <br />A. Prompt notice of all defective Work of which <br />OWNER or ENGINEER has actual knowledge will be <br />given to CONTRACTOR. All defective Work may be <br />rejected, corrected, or accepted as provided in this <br />Article 13. <br />13.02 Access to Work <br />A. OWNER, ENGINEER, ENGINEER's Con- <br />sultants, other representatives and personnel of <br />OWNER, independent testing laboratories, and <br />governmental agencies with jurisdictional interests will <br />have access to the Site and the Work at reasonable <br />times for their observation, . inspecting, and testing. <br />CONTRACTOR shall provide them proper and safe. <br />conditions for such access and advise them of <br />13.03 Tests and Inspections <br />A. CONTRACTOR shall give ENGINEER timely <br />notice of readiness of the Work for all required <br />inspections, tests, or approvals and shall cooperate <br />with inspection and testing personnel to facilitate <br />required inspections or tests. <br />C. If Laws or Regulations of any public body <br />having jurisdiction require any Work (or part thereof) <br />specifically to be inspected, tested, or approved by an <br />employee or other representative of such public body, <br />CONTRACTOR shall assume full responsibility for <br />arranging and obtaining such inspections, tests, or <br />approvals, pay all costs in connection therewith, and <br />furnish ENGINEER the required certificates of inspec- <br />tion or approval. <br />D. CONTRACTOR shall be responsible for <br />arranging and obtaining and shall pay all costs in <br />connection with any inspections, tests, or approvals <br />required for OWNER's and ENGINEER's acceptance <br />of materials or equipment to be incorporated in the <br />Work; or acceptance of materials, mix designs, or <br />equipment submitted for approval prior to <br />CONTRACTOR's purchase thereof for incorporation <br />in the Work. Such inspections, tests, or approvals <br />shall be performed by organizations acceptable to <br />OWNER and ENGINEER. <br />E. If any Work (or the work of others) that is to <br />be inspected, tested, or approved is covered by CON- <br />TRACTOR without written concurrence of ENGI- <br />NEER, it must, if requested by ENGINEER, be uncov- <br />ered for observation. <br />CONTRACTOR's Site safety procedures and F. Uncovering Work as provided in paragraph <br />programs so that they- may ` comply therewith as 13.03.E shall be at CONTRACTOR's expense unless <br />applicable. CONTRACTOR has .given ENGINEER timely notice <br />00700 - General Conditions REV 5-10-13 <br />00700-36 <br />F:\Public WorksXENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase II\1-Admin\RE-bids\Bid DocumentsWaster Contract <br />. Documents\00700 -General Conditions REV 5r10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.