My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br />GENERAL CONDITIONS <br />SC -1.00 Introduction <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract <br />Documents as indicated below. All provisions, which are not so amended or supplemented, <br />remain in full force and effect. <br />The terms used in these Supplementary Conditions will have the meanings indicated in the <br />General Conditions. <br />SC -1.01 Defined Terms <br />SC -1.01.A.20. Delete paragraph GC 1.01.A.20 in its entirety. <br />SC -1.02 Terminology <br />SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and <br />insert the following paragraphs in their place: <br />D. Furnish, Install, Perform, Provide <br />1. The word "furnish" shall mean to supply and deliver services, materials, or <br />equipment to the Site (or some other specified location) ready for use or <br />installation and in usable or operable condition. <br />2. The word "install" shall mean to put into use or place in final position services, <br />materials, or equipment complete and ready for intended use. <br />3. The words "perform" or "provide" shall mean to furnish and install services, <br />materials, or equipment complete and ready for intended use. <br />SC -2.05 Before Starting Construction <br />SC -2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its <br />place: <br />C. Evidence of Insurance: CONTRACTOR shall not commence work under this <br />Contract until he has obtained all insurance required under Article 5 and such <br />insurance has been delivered to the OWNER and approved by the OWNER, nor <br />shall the CONTRACTOR allow any Subcontractor to commence work on his <br />subcontract until all similar insurance required of the Subcontractor has been so <br />obtained and approved. All such insurance shall remain in effect until final <br />payment and at all times thereafter when CONTRACTOR may be correcting, <br />removing or replacing defective Work in accordance with Article 13. <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its <br />placer <br />A. Immediately after awarding the contract, but before the CONTRACTOR begins <br />work, the Project Manager will call a p,reconstruction conference at a place the <br />00800-1 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase 11\1-Admin\RE-bids\Bid <br />DocumentsWaster Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.