SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />The OWNER has obtained the following permits (copies of these permits are <br />contained in Appendix °A"): <br />A. Indian River Farms Water Control District — Permit No. 17-35 <br />B. Florida Department of Environmental Protection General Permit — No. <br />0039206-965-DSGP <br />C. St. Johns River Water Management District - The proposed <br />improvements are exempt by rule under Florida Administrative Code 62- <br />330.051(4)(c) Exempt Activities. <br />2. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences <br />in its place: <br />CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.6) for the additional or unforeseen work. Labor includes foremen <br />actually engaged in the work; and will not include project supervisory personnel nor <br />necessary on-site clerical staff, except when the additional or unforeseen work is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Compensation <br />for project supervisory personnel, but in no case higher than a Project Manager's <br />position, shall only be for the pro -rata time such supervisory personnel spent on <br />the contract. In no case shall an officer or director of the Company, nor those <br />persons who own more than 1% of the Company, be considered as project <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal <br />holidays, shall be included in the above to the extent authorized by OWNER. <br />SC -13.03 Test and Inspections <br />SC -13.03.6. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in <br />its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge.. to subsequent <br />.applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />00800-7 . <br />00800 - Supplementary Conditions 05-1.3 rev <br />OO800.7F:\Public Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase 1111-Admin\RE-bids\Bid <br />Documentswaster Contract.,Documents\00800 - Supplementary Conditions 05-13 rewdoc - <br />