Laserfiche WebLink
SECTION 00948 -Work Change Directive. <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: 45th STREET BEAUTIFICATION PROJECT PHASE II <br />OWNER's Project No. IRC -1748 <br />OWNER's Bid No. 2019008 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />❑ Unit Prices <br />❑ Lump Sum <br />L7 Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />II Other: <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED. <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date: <br />Date: <br />* * END OF SECTION <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th' Street Beautification Project Phase 11\1- <br />Admin\RE-bids\Bid Documents\Ntaster Contract Documents\00948 _- Work Change Directive Rev 06-2013.doc <br />