My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01024 <br />FORCE ACCOUNT <br />1.1 General <br />CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br />necessary to perform additional work not covered on the Contract Drawings. <br />The force Account is intended as a contingency for unforeseen work. <br />1_1 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. <br />The value of force account work will be determined in accordance with Article <br />12 of the General Conditions. <br />+ + END OF SECTION + + <br />01024- 1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood : 45th Street Beautification Project Phase I1\1 <br />Admin\RE-bids\Bid DocumentsWaster Contract Documents\01024 - Force AccountAoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.