My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01550 <br />ACCESS ROADS, PARKING AREAS <br />AND USE OF PUBLIC STREETS <br />1.1 GENERAL <br />A. Provide all temporary construction roads, walks and parking areas required <br />during construction and for use of emergency vehicles. Design and maintain <br />temporary roads and parking areas so they are fully usable in all weather <br />conditions. <br />B. Prevent interference with traffic and the OWNER's operations on existing roads. <br />Indemnify and save harmless the OWNER from any expenses caused by <br />CONTRACTOR's operations over these roads. <br />C. Roadways damaged by CONTRACTOR shall be restored to their original <br />condition by the CONTRACTOR subject to approval of the OWNER or <br />ENGINEER. <br />D. Remove temporary roads, walks and parking areas prior to final acceptance and <br />return the ground to its original condition, unless otherwise required by the <br />Contract Documents. <br />1.2 USE OF PUBLIC STREETS <br />The use of public streets and alleys shall be such as to provide a minimum of <br />inconvenience to the public and to other traffic. Any earth or other excavated <br />material spilled from trucks shall be removed immediately by the CONTRACTOR <br />and the streets cleaned to the satisfaction of the Owner. <br />1.3 USE OF PUBLIC STREETS FOR HAUL ROADS <br />A. Prior to construction, the CONTRACTOR shall designate all proposed haul <br />roads to be used during the life of the project. Any earth or other materials <br />spilled from trucks shall be removed by the CONTRACTOR and streets <br />cleaned to the satisfaction of the Owner. He further shall be responsible for <br />repairs to any damages caused by his operations, prior to final payment. <br />B. All trucks carrying earth shall be covered while moving with an appropriate <br />tarpaulin. Should trucks hauling earth fail to cover their loads, the <br />CONTRACTOR will be given two (2) written warnings, after which the <br />CONTRACTOR shall pay,a fine of $50 per uncovered truck to the Owner <br />when invoked by the Owner to Owner's Engineer. All cleanup shall be the <br />responsibility of the CONTRACTOR. <br />01550 Access Roads <br />01.550-1 <br />F:\Public Works\ENGINEERING-DIVISION PROJECTS\1.748 Gifford Neighborhood - 45th. Street Beautification Project Phase I1\1 <br />Admin\RE-bidsSid Docu ments\M aster Contract Documents\01550= Access Roads.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.