My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.1 GENERAL <br />A. Make all arrangements for transportation, delivery and handling of equipment <br />and materials required for prosecution and completion of the Work. <br />B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br />to the site only during regular working hours. Shipments shall be addressed and <br />consigned to the proper party giving name of Project, street number and city. <br />Shipments shall not be delivered to OWNER except where otherwise directed. <br />C. If necessary to move stored materials and equipment during construction, <br />CONTRACTOR shall move or cause to be moved materials and equipment <br />without any additional compensation. <br />1.2 DELIVERY <br />A. Arrange deliveries of products in accord with construction schedules and in <br />ample time to facilitate inspection prior to installation. <br />B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br />accommodate the following: <br />1. Work of other contractors, or OWNER. <br />2. Limitations of storage space. <br />3. Availability of equipment and personnel for handling products. <br />4. OWNER'S use of premises. <br />C. Do not have products delivered to project site until related Shop Drawings have <br />been approved by the ENGINEER. <br />D. Do not have products delivered to site until required storage facilities have been <br />provided. <br />E. Have products delivered to site in manufacturer's original, unopened, labeled <br />containers. Keep ENGINEER informed of delivery of all equipment to be <br />incorporated in the Work. <br />F. Partial deliveries of component parts of equipment shall be clearly marked to <br />identify the equipment, to permit easy accumulation of parts, and to facilitate <br />assembly. <br />01610-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood`- 45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid DocumentsUister Contract Documents\01610 - Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.