My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Samples, if appropriate. <br />d. Name and address of similar projects on which product was used, <br />and date of installation. <br />2. For construction methods (if specified): <br />a. Detailed description of proposed method. <br />b. Drawings illustrating method. <br />3. Such other data as the ENGINEER may require to establish that the <br />proposed substitution is equal to the product, manufacturer or method <br />specified. <br />C. In making Request for Substitution, CONTRACTOR represents that: <br />1. CONTRACTOR has investigated proposed substitution, and deter- <br />mined that it is equal to or superior in all respects to the product, <br />manufacturer or method specified. <br />2. CONTRACTOR will provide the same or better guarantees or <br />warranties for proposed substitution as for product, manufacturer, or <br />method specified. <br />3. CONTRACTOR waives all claims for additional costs or extension of <br />time related to a proposed substitution that subsequently may become <br />apparent. <br />D. A proposed substitution will not be accepted if: <br />1. Acceptance will require changes in the design concept or a substantial <br />revision of the Contract Documents. <br />2. It will delay completion of the Work, or the work of other contractors. <br />3. It is indicated or implied on a Shop Drawing and is not accompanied by <br />a formal Request for Substitution from CONTRACTOR. <br />E. If the ENGINEER determines that a proposed substitute is not equal to that <br />specified, furnish the product, manufacturer, or method specified at no additional <br />cost to OWNER. <br />F. Approval of a substitution will not relieve CONTRACTOR from the requirement <br />for submission of Shop Drawings as set forth in the Contract Documents. <br />G. The procedure for review by Engineer will include the following: <br />1. Requests for review of substitute items of material and equipment will <br />not be accepted by Engineer from anyone other than CONTRACTOR. <br />2. Upon receipt of an application for review of a substitution, Engineer will <br />determine whether the review will be more extensive than a normal shop <br />drawing review for the specified item. <br />3. If the substitution will not require a more extensive review, Engineer will <br />proceed with the review without additional cost to CONTRACTOR. <br />01630-2 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1748 GiffordNeighborhood - 45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid Docuinents\Master Contract Documents\01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.