A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section <br />consists of maintaining traffic within the limits of the project for the duration of the <br />construction period, including any temporary suspensions of the work. It shall <br />include the construction and maintenance of any necessary detour facilities; the <br />providing of necessary facilities for access to residences, businesses, etc., along <br />the project; the furnishing, installing and maintaining of traffic control and safety <br />devices during construction, the control of dust through the use of calcium chloride if <br />necessary, and any other special requirements for safe and expeditious movement <br />of traffic as may be called for on the plans. The term, Maintenance of Traffic, as <br />used herein, shall include all of such facilities, devices and operations as are <br />required for the safety and convenience of the public as well as for minimizing public <br />nuisance; all as specified in this Itemized Section 14 of these provisions and <br />Paragraph 24 in General Conditions Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractorshall <br />present his Maintenance of Traffic Plan at the pre -construction conference. The <br />Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br />barricades, striping and barriers to be used for the safe passage of pedestrians and <br />vehicular traffic through the project and for the protection of the workmen. The plan <br />will indicate conditions and setups for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />than the plan specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of <br />Traffic Plan that become necessary shall also be approved in writing. Except in an <br />emergency, no changes to the approved plan will be allowed until approval to <br />change such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included in <br />the pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on <br />the project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />schedule of these inspections and be given the opportunity to join in the inspection <br />as is deemed necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barriers which are <br />necessary to protect the public and workmen from hazards within the project limits. <br />01025-2 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase 11\1- <br />Admin\RE-bids\Bid Documents\Master Contract Documents\Technical Specifications UPDATED 5-25-2017.doc <br />