Laserfiche WebLink
H <br />driving surface at the vehicle exit point(s). Locate the site egress driveways a <br />minimum of 25 feet from all drainage inlets or pipes. Provide an area large enough <br />to remove the sediment and soil from vehicle wheels before the vehicle leaves the <br />construction site or work area. Provide wash -down stations as required to wash <br />vehicle tires and retain all washwater on-site. Do not use limerock. <br />Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Limerock shall not be used under any circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and <br />meeting the requirements of FDOT Standard Specifications for Road and <br />Bridge Construction, Section 901. <br />Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, and <br />all other erosion damage to the Work. This responsibility shall not end until Final <br />Acceptance of the Work by the OWNER. Included is damage caused by erosion of <br />any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including Acts of <br />God. Restore all erosion damaged areas to design grades and elevations. Also, <br />refer to General Conditions 6.13.6. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-2 — Prevention, Control & Abatement of Erosion and Water <br />Pollution Control — Per Lump Sum <br />Bid Item No. 104-10-3 — Sediment Barrier - Per Linear Foot <br />Bid Item No. 104-11 — Floating Turbidity Barrier — Per Linear Foot <br />Bid Item No. 104-18 — Inlet Protection System — Per Each <br />[The remainder of this page was left intentionally blank] <br />01025-10 Technical Specifications <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />