My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H <br />driving surface at the vehicle exit point(s). Locate the site egress driveways a <br />minimum of 25 feet from all drainage inlets or pipes. Provide an area large enough <br />to remove the sediment and soil from vehicle wheels before the vehicle leaves the <br />construction site or work area. Provide wash -down stations as required to wash <br />vehicle tires and retain all washwater on-site. Do not use limerock. <br />Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Limerock shall not be used under any circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and <br />meeting the requirements of FDOT Standard Specifications for Road and <br />Bridge Construction, Section 901. <br />Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, and <br />all other erosion damage to the Work. This responsibility shall not end until Final <br />Acceptance of the Work by the OWNER. Included is damage caused by erosion of <br />any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including Acts of <br />God. Restore all erosion damaged areas to design grades and elevations. Also, <br />refer to General Conditions 6.13.6. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-2 — Prevention, Control & Abatement of Erosion and Water <br />Pollution Control — Per Lump Sum <br />Bid Item No. 104-10-3 — Sediment Barrier - Per Linear Foot <br />Bid Item No. 104-11 — Floating Turbidity Barrier — Per Linear Foot <br />Bid Item No. 104-18 — Inlet Protection System — Per Each <br />[The remainder of this page was left intentionally blank] <br />01025-10 Technical Specifications <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.