My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 110 - CLEARING AND GRUBBING <br />The work specified in this item shall conform to Section 110 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction with the following <br />modifications: <br />A. Prior to any clearing and grubbing, the contractor will stake the right-of-way. <br />Unimproved areas shall be cleared of trees, logs, stumps, brush, vegetation, <br />rubbish and other perishable or objectionable matter within limits shown on the <br />plans excepting for certain trees and shrubs shown on the plans or as directed by <br />the Engineer which are to remain undisturbed and protected. Stumps and roots <br />between slope stakes in cuts and in embankments 3 feet or less in depth shall be <br />removed to a depth of 18 inches below subgrade. No stumps, roots, or perishable <br />matter of any description shall remain under concrete slabs or footing, including <br />pavement and sidewalks. <br />B. No trees shall be removed or relocated until the Engineer or his representative has <br />marked all trees to be saved, after a review of the project site with the Contractor's <br />representative. <br />C. Where the final pavement or structural work will be close to existing trees, the <br />Contractor shall exercise care in the vicinity of the trees. Further, the Contractor <br />shall saw cut along the edge of the outside limits of the stabilization, structure <br />subgrade or sidewalk to a minimum depth of 4 feet below the finish grade and paint <br />with a commercial grade pruning paint the ends of all sawn roots. If directed by the <br />Engineer or where shown on the drawings, work shall be done by hand in order to <br />protect the trees. <br />D. The Contractor shall exercise care when working in the vicinity of all trees to remain <br />so as to not damage or remove major root structures. The Contractor shall not pull <br />hair or major root structures. All severed roots shall be sawn clean and paint with <br />pruning paint. Stumps, roots, etc., shall be completely removed and disposed of by. <br />the Contractor. Undesirable, dead, and/or damaged trees (as so designated by the <br />Engineer) shall be removed. <br />E. All trees to be removed shall be disposed off site; burning will be strictly prohibited. <br />F. All trees or shrubs which are to remain shall be preserved and protected by the <br />Contractor. Where the removal of valuable trees or shrubs specifically for <br />transplanting is required, this work shall be done in cooperation with the Owner and <br />at no additional expense to the Owner. <br />G. All items to be removed shall be excavated to their full depth. All culverts removed <br />from residential driveway entrances within the right-of-way shall become the <br />property of the respective homeowner. Those homeowners not desiring the <br />culverts may donate them to the County free of charge. (See Paragraph C, Special <br />Provisions) The Contractor shall transport the culverts to the County's storage yard. <br />All metal castings for catch basins, manholes, or other structures shall be carefully <br />01025-14 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTSM48 Gifford Neighborhood - 45th Street Beautification Project Phase IM- <br />Admin\RE-bids\Bid DocumentsWlaster Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.