My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 570 — PERFORMANCE TURF <br />The work specified in this item shall conform to Section 570 of the Florida Department <br />of Transportation Standard Specifications for Road and Bridge Construction. <br />A. Description: Sod for the project shall be of the variety that is common to the area <br />and of a variety approved by the Engineer. This work shall also include mowing, to <br />be mowed at maximum 6" height with a mulching mower. <br />B. Work Included: Scope of Work: The work specified in this section consists of the <br />establishing of a stand of grass, within the project, right-of-way, easements, and <br />other areas indicated on the Drawings, by furnishing and placing grass sod. Also <br />included are fertilizing, watering and maintenance as required to assure a healthy <br />stand of grass. Two applications of fertilizer will be required with the initial <br />application being fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non -survival or lack of health and vigor, or which do <br />not exhibit the characteristics to meet specifications, shall be replaced within two <br />weeks of notice from Owner or Engineer. All replacement sod shall be <br />furnished/installed at no additional cost to the Owner and shall be guaranteed for <br />three months. All replacement shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is <br />received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth <br />shall be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-3.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be <br />scarified or loosened to a depth and then raked smooth and free from debris. <br />Where the soil is sufficiently loose and clean, the Owner, at his discretion, may <br />authorize the elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br />range of 6.0 - 7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the <br />second application shall be. "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 <br />pounds per acre,, or 10 pounds per.1,000 square feet, by a spreading device <br />01025-20 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid DocumentsWaster Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.