Laserfiche WebLink
in such a way that the location of the construction may be compared with the <br />construction plans. <br />❑ (b) Clearly shows by symbols, notations, or delineations, those constructed <br />improvements located by the survey. <br />❑ (c) All maps prepared shall meet applicable minimum technical standards. <br />❑ (d) Vertical and horizontal accuracy of the measurements made shall be such <br />that it may be determined whether the improvements were constructed <br />consistent with planned locations. <br />(END OF SECTION) <br />01025-31 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-20.17.doc <br />