ITEMIZED BID SCHEDULE
<br />PROJECT NAME: 45th STREET BEAUTIFICATION PHASE II
<br />PROJECT NO. IRC -1748 BID NO. 2019008
<br />BIDDER'S NAME: Johnson -Davis Inc.
<br />00310-3
<br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1-Admin\RE-bids\Bid Documents\Master Contract
<br />Documents\MASTER ITEMIZED BID SCHEDULE
<br />101-1
<br />MOBILIZATION
<br />LS
<br />1
<br />p O�
<br />` 15 aocC
<br />102-1
<br />MAINTENANCE OF TRAFFIC
<br />LS
<br />1
<br />t00 o" o
<br />0� SOD
<br />104-2
<br />PREVENTION, CONTROL & ABATEMENT OF EROSION AND WATER
<br />POLLUTION
<br />LS
<br />1
<br />32) ooc?
<br />92 000
<br />104-10-3
<br />SEDIMENT BARRIER
<br />LF
<br />4,750
<br />�2-
<br />I 50
<br />FLOATING TURBIDITY BARRIER
<br />LF
<br />185
<br />to
<br />1 S50-
<br />50104104-11
<br />-18
<br />104-18
<br />INLET PROTECTION SYSTEM
<br />EA
<br />14
<br />2-00
<br />1 Soo
<br />110-1-1
<br />CLEARING & GRUBBING
<br />LS
<br />1
<br />125 oa-?
<br />1,2_5000
<br />110-7-1
<br />MAILBOX, F&I SINGLE
<br />EA
<br />3
<br />L4 ©`'"7
<br />1 200
<br />120-1
<br />REGULAR EXCAVATION
<br />CY
<br />2,689
<br />-70
<br />5
<br />120-4
<br />SUBSOIL EXCAVATION & BACKFILL REPLACEMENT
<br />CY
<br />260}u�©
<br />120-6
<br />EMBANKMENT
<br />CY
<br />11,729
<br />l.5
<br />1751135
<br />162-1-13
<br />PREPARED SOIL AMENDMENT
<br />CY
<br />53
<br />�40
<br />2 12- 0
<br />285-714
<br />OPTIONAL BASE, BASE GROUP 14 CEMENTED COQUINA, LBR 100
<br />SY
<br />664
<br />b
<br />J �
<br />327-70-1
<br />MILLING EXIST ASPH PAVT, 1" AVG DEPTH
<br />SY
<br />319
<br />7975
<br />334-1-53
<br />SUPERPAVE ASPHALTIC CONCRETE, SP 9.5 TRAFFIC C, PG 76-22
<br />TN
<br />110
<br />X2,5
<br />c3 of>
<br />33 00©
<br />400-1-2
<br />CONCRETE CLASS I, ENDWALLS
<br />CY
<br />21
<br />900
<br />1 C(0O
<br />425-1-543
<br />INLETS, DITCH BOTTOM, TYPE D, J BOT, <10'
<br />EA
<br />1
<br />10 000
<br />10000 0000
<br />425-1-543A
<br />INLETS, DITCH BOTTOM, TYPE D, J BOT, <10' INTEGRALLY CAST
<br />EA
<br />8
<br />1"9000
<br />b 000
<br />425-1-544
<br />INLETS, DITCH BOTTOM, TYPE D, J BOT, >10'
<br />EA
<br />2
<br />, ��o�'
<br />©Ci 0
<br />425-1-544A
<br />INLETS, DITCH BOTTOM, TYPE D, J BOT, >10' INTEGRALLY CAST
<br />EA
<br />2
<br />13
<br />425-2-72
<br />MANHOLES, J-7, >10'
<br />EA
<br />1
<br />3
<br />3o o 0`o
<br />430-175-118
<br />PIPE CULVERT, ROUND, 18" S/CD RCP, CL III
<br />LF
<br />64
<br />13
<br />3,320
<br />430-175-124
<br />PIPE CULVERT, ROUND, 24" S/CD RCP, CL III
<br />LF
<br />24
<br />16
<br />36"00
<br />430-175-130
<br />PIPE CULVERT, ROUND, 30" S/CD RCP, CL III
<br />LF
<br />16
<br />2 o 0
<br />3 2 0 c)
<br />430-175-136
<br />PIPE CULVERT, ROUND, 36" S/CD RCP, CL III
<br />LF
<br />12
<br />2t, 0
<br />� 0
<br />430-175-148
<br />PIPE CULVERT, ROUND, 48" S/CD RCP, CL III
<br />LF
<br />16
<br />23,-:)
<br />©2
<br />430-175-154
<br />PIPE CULVERT, ROUND, 54" S/CD RCP, CL III INSTALL ONLY
<br />LF
<br />271
<br />6,S
<br />2-; 0 3
<br />00310-3
<br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1-Admin\RE-bids\Bid Documents\Master Contract
<br />Documents\MASTER ITEMIZED BID SCHEDULE
<br />
|