My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Project: SR 60 Watermain Improvements <br />Client City of Vero Beach Water & Sewer Dept. <br />17-17 th Street, P.O. Box 1389 <br />Vero Beach, fL 32961 <br />Contact: Robert Bolton, P.E 772-978-5151 <br />Nature of Work: *Installation of 8000 If 6" through 12" Watermain piping <br />*Install under sidewalk and travel lanes of SR 60 in Downtown Vero Beach <br />*Work includes services, tie-ins, valves, and fire hydrants <br />* Maintenance of traffic concerns and extensive night work highlighted project <br />Start Date: <br />Completion Date <br />November 2017 <br />May 2018 <br />Total Contract Amount: $1,186,523 <br />0 NSON-DAVIS, INC, <br />363 S. Kings Hwy <br />E"Ort Pierce, FL 34945 <br />Phone (772) 468-9200 <br />y <br />-72) 468-9202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.