Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Johnson -Davis, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project includes piping approximately 3,800 linear feet of the Indian River <br />Farms Water Control District A-7 Canal, construction of a 6' wide sidewalk and <br />landscaping improvements. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 45th STREET BEAUTIFICATION PROJECT PHASE II <br />County Project Number: IRC -1748 <br />Bid Number: 2019008 <br />Project Address: 45th Street from 431 Avenue to 28th Court <br />Vero Beach, Florida 32967 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 180th calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />00520 - Agrebment (Public Works) REV 06-14.doc <br />00520-2 <br />F:\Purchasing\Bids\2018-2019 FY (2019000)\2019008 45th Street Beautification Phase 11 Rebid\00520 - Agreement (Public Works) REV 06-14.doc <br />