My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253G
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:30:02 PM
Creation date
12/17/2018 1:19:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253G
Agenda Item Number
8.G.
Entity Name
Green Construction Technologies
Subject
US Highway 1 landscaping
Area
South County Line to Oslo Road
Project Number
IRC-1631
Bid Number
2019016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONSTRUCTION BOND <br />Bond No. 6021201429 <br />(enter bond number) <br />BY THIS BOND, We Green Construction Technologies Inc. , as Principal and <br />United States Fire Insurance Company a corporation, as Surety, are <br />bound to Indian River County, FL , herein called Owner, in the sum <br />of $373,659.52, for payment of which we bind ourselves, our heirs, personal <br />representatives, successors, and assigns, jointly and severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract dated a✓ 3 , , between Principal and Owner for <br />construction Of US Highway 1 Landscaping - South County Line to Oslo Road (IRC -1631) - Bid No 2019016, <br />the contract being made a part of this bond by reference, at the times and in the manner <br />prescribed in the contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work provided for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; and <br />4. Performs the guarantee of all work and materials furnished under the contract for the <br />time specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON <br />The provisions and limitations of Section 255.05 Florida Statutes, <br />including but not limited to the notice and time limitations in <br />Sections 255.05(2) and 255.05(10), are incorporated in this bond <br />by reference. <br />00610-3 <br />Green Construction <br />Technologies, Inc. <br />Name of Pri mal <br />B0 �1( � pve__S <br />_)(As Attorny l Fact) <br />United States Fire Insurance <br />Company <br />Name of Surety) <br />By: <br />Charles J. Nielson, Atty.-In-Fact <br />
The URL can be used to link to this page
Your browser does not support the video tag.