My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 12:28:12 PM
Creation date
12/21/2018 12:35:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/13/2018
Meeting Body
Board of County Commissioners
Subject
Zorc Notes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
661
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER, and CONTRACTOR, in consideration of the mutual <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as,specifie <br />Documents. The Work is generally described as follows; <br />The project includes piping approx m� ately 3;801 <br />Farms Water Control District A-7 Canal, construction <br />landscaping improvements. <br />ARTICLE 2 - THE PROJECT C,\\\\) ) <br />2.01 The Project for which the Work <br />part is generally described as fc <br />Project Name: Stn>, <br />County Project ber <br />Bid`Number: <br />Vero�Beach, Florida 32967 <br />nts hereinafter set forth, <br />C <br />linear feet <br />11 <br />of 6'v <br />in the Contract <br />River <br />and <br />ments may be the whole or only a <br />CT PHASE I <br />3.01 The'Indian River�County Public Works Department is hereinafter called the ENGINEER <br />and will dc— as 0WNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion,of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />' for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 180th calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />@BCL@6COD3FB8f)3 <br />00520-2 <br />C:\UsersUegistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@6COD3FB8\@BCL@6COD3FB8.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.