Laserfiche WebLink
H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />1. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate <br />all terms and conditions for performance and furnishing of th <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />W <br />A. The Contract Documents consist of the <br />This Agreement (pages 00520-1 <br />2. Notice to Proceed (page <br />3. Public Construction Bond <br />4. Sample Ce <br />5. Contractor's Appl <br />10. Suppleme <br />convey understanding of <br />rk. <br />to 00622-6 inclusive); <br />es 00630-1 to 00630-2, inclusive); <br />Work (pages 00632-1 to 00632-2, inclusive); <br />Certification as to Elevations and Locations of the <br />es 00700-1 to 00700-45, inclusive); <br />ns (pages 00800-i to 00800-11, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 <br />(Technical Provisions); <br />12. Drawings consisting of a cover sheet and sheets numbered 1 through 58, inclusive, <br />with each sheet bearing the following general title: 45th STREET BEAUTIFICATION <br />PROJECT PHASE II; <br />13. Addenda (if applicable ); <br />14. Appendices to this Agreement (enumerated as follows): <br />Appendix A — Permits <br />@BCL@6COD3FB8.1567 <br />00520-6 <br />CAUsers\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@6COD3FB8\@BCL@6COD3FB8.doc <br />