EXHIBIT `2' <br />FEESCHEDULE <br />WORK ORDER NO.3 <br />Method and Amount of Compensation <br />Schulke, Bittle & Stoddard, L.L.C. proposes to provide the outlined Scope of Work (see <br />Exhibit `i', attached and pre -ceding this exhibit) for compensation by IRC, the amounts <br />listed below: <br />Task 1• Survey and Base Plan Preparation $60,300.00 <br />- Utility locates and Prepare route survey of SR A -1-A $ 8,500.00 <br />- Excavation / "pot holing" existing utilities, backfill, $40,800.00 *est. <br />re -grade and grass disturbed areas. (if required). <br />(assume 34 locations, by a licensed utility contractor) <br />- Survey of "pot holed" utilities $ 4,000.00 <br />- Base Plan preparation $ 7,500.00 <br />Task 2• Preliminary Engineering — Re -use main route: $16,000.00 <br />- Base Plan evaluation $ 2,000.00 <br />- Geotechnical data — soil borings (1 per 500 ft+- along route). $ 4,000.00 <br />- Preliminary Construction plan and cost estimate (of re -use mains) $ 7,500.00 <br />- Preliminary Report of Findings $ 2;500.00 <br />Task 3: Preliminary Engineering — Hydraulic Model/ system <br />recommendations/ Final report $22,500.00 <br />Evaluation of service area, and hydraulic analysis/model of <br />the IRCDUS re -use water system proposed to service this area $ 14,000.00 <br />Revise/ update preliminary construction plans and cost estimate $ 4,000.00 <br />Prepare Final Report — attend BCC and other public meetings <br />(as required) $ 6,000.00 <br />Reimbursable Expenses: $ 2,000.00 est. <br />- Reimbursement for payment of direct costs, including <br />Reproduction, copies, prints, mail, Fed -Ex, etc. <br />(See next page for actual costs) <br />TOTAL: $102,800.00 <br />*est. = estimated amount. Actual cost will vary depending on quantity provided. Price based on cost of <br />utility crew at $1200 per day, and one trench excavation, survey and restoration per day <br />