My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/20/2018_SpecialCall
CBCC
>
Meetings
>
2010's
>
2018
>
11/20/2018_SpecialCall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 12:40:06 PM
Creation date
12/21/2018 2:52:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Hearing
Document Type
Agenda Packet
Meeting Date
11/20/2018
Meeting Body
Board of County Commissioners
Subject
Brightline; All Aboard Florida; Virgin Trains USA
Settlement agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
adding to that average the amount invoiced by FECR for signal inspection fees during the year <br />2017. Indian River shall not be deemed in breach of this Agreement due to any action, inaction, <br />or omission by a municipality. The municipality shall also be required, as a condition of obtaining <br />the benefit of such amendments, to execute a separate agreement with Brightline in the form <br />attached as Exhibit H, in which the municipality shall make the commitments reflected in <br />paragraph 11 below. The amendments shall further provide that the municipality shall remain <br />solely responsible for paying FECR the applicable license fee for each crossing per year. <br />0) Based on Brightline's analysis of the FRA's Quiet Zone calculator, <br />Brightline believes that, in view of the crossing improvements identified in Exhibits D-1 and D-2, <br />Indian River will qualify with the FRA as a Quiet Zone so long as Indian River , in its entirety, <br />applies for a Quiet Zone designation. Brightline agrees to support the applications for Quiet Zone <br />designations by Indian River and/or any municipality within Indian River that qualify under FRA's <br />Quiet Zone calculator for a Quiet Zone designation. <br />4. Martin Aerial Pedestrian Bridize. <br />(a) Subject to the concurrence of FECR, Brightline agrees to Martin's <br />construction of an aerial pedestrian bridge over the FECR ROW at a location in Stuart, Florida, <br />mutually agreeable to Martin and Brightline. <br />(b) Martin agrees to execute FECR's standard form Aerial Easement <br />Agreement as attached hereto as Exhibit I, pursuant to which Martin will pay FECR a onetime <br />aerial easement fee in an amount not to exceed $47,600. The grant of the aerial easement shall be <br />subject to compliance with FECR and Brightline engineering requirements and approvals. Martin <br />agrees that the indemnity and insurance obligations under FECR's standard form Aerial Easement <br />Agreement shall be modified to extend to both FECR and Brightline. <br />(c) Construction. Martin shall be responsible for the actual construction of the <br />aerial pedestrian bridge and any liability associated therewith; provided, however, that the method <br />and manner of construction and maintenance (but not any bidding process including awards of <br />bids) shall be subject to the approval of FECR and Brightline, to ensure non-interference with rail <br />or fiber optic operations. <br />(d) Construction Costs. Martin and Brightline shall share responsibility for the <br />cost of constructing the aerial pedestrian bridge, on an equal basis. Martin and Brightline shall <br />each endeavor to obtain federal, state, and/or other grant money for the construction of the bridge, <br />and if either or both is successful, their payment obligations shall be reduced on an equal basis. <br />For example, if Martin were to obtain a grant in the amount of $500,000, Martin's and Brightline's <br />respective payment obligations would be reduced by $250,000 each. Brightline shall pay its share <br />of such construction costs to Martin within sixty (60) days after Martin provides Brightline proof <br />of payment to contractors. <br />(e) Maintenance. Martin shall be solely responsible for the actual maintenance <br />of the aerial pedestrian bridge and the cost of maintenance and replacement of the aerial pedestrian <br />bridge, as needed. <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.