the product by an alternative method. But the unique challenges posed by the rail transportation <br />of LNG require us to ensure that we are doing everything we can to keep railroad employees and <br />communities along the proposed routes safe. FEC's proposed LNG transportation routes <br />traverse congested, highly populated areas, with frequent highway -rail grade crossings. Any <br />LNG transported along the proposed routes would eventually share the routes with high- <br />performance passenger trains operating at speeds of up to 11 Q mph. The complexity of this <br />operating environment requires FRA to conduct a thorough evaluation of FEC's proposal to <br />ensure public safety. <br />Over recent months, FRA has carefully reviewed the information FEC provided in support of ij <br />request to transport LNG by rail on its operational territory. We appreciate the documentation <br />FEC has provided to date; however, FRA requires additional information to fully evaluate a <br />railroad's request. A guidance document detailing the information required for FRA's <br />consideration of FEC's request is enclosed with this letter. Although, FEC has provided much <br />the information listed in this guidance document, the four items listed below remain outstandin <br />1. The design details of the restraint system used to secure the portable tanks to the car, <br />including the types and number of restraints, the standard (and details in quantitative ` <br />terms) to which the restraints conform, and the different direction g -forces the restraints <br />are designed and constructed to withstand (paragraph 3 on the enclosed guidance <br />document); <br />2. At least the past 5 years of accident experience data (main line, yard, grade crossing, etc.) <br />on the proposed transportation route (paragraph 6 on the enclosed guidance document); <br />3. Analyses, experimental data, or other identifiable scientific data used in the design of the <br />railcar on which the portable tanks are mounted demonstrating the car's ability to <br />withstand normal and accident -caused abnormal forces in rail transportation (paragraph I <br />12 on the enclosed guidance document); and <br />4. A detailed risk analysis of the proposed operation and appropriate mitigating measures. <br />(Paragraph 13 on the enclosed guidance document sets forth the minimum requirements <br />of this risk analysis.) <br />In addition, given the unique risks presented by FEC's proposed operation, FRA also requires <br />that FEC take the following actions: <br />Conduct a safety analysis of the rail cars it plans to use in LNG transport. The analysis, <br />must include and demonstrate under car protection. FEC must submit the analysis to <br />FRA for approval; and <br />2. Ensure each portable tank used to transport LNG is equipped with functioning GPS - <br />based, telemetric communication equipment. The equipment must accurately measure <br />and report the following data on each portable tank containing LNG at all times the tank: <br />are in transportation: (a) location; (b) pressure in the tank; <br />(c) temperature in the tank; (d) volume in the tank; and (e) any impact to a portable tank. <br />