My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-278A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-278A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 3:03:41 PM
Creation date
1/8/2019 1:18:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/11/2018
Control Number
2018-278A
Agenda Item Number
8.F.
Entity Name
Bowman Consulting Group
Subject
Reclamation 58th Avenue Communication Network
Alternate Name
Amendment No. 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowman <br />C o N S U L T l N G <br />ATTACHMENT 1 <br />November 9, 2018 <br />Mr. William Johnson, P.E. <br />Roadway Production Engineer <br />Indian River County <br />1801 27th Street —Building A <br />Vero Beach, FL 32960 <br />RE: IRC 1325 — 58"' Avenue FDR, Proposal for Additional Engineering Services <br />Dear Mr. Johnson: <br />Bowman Consulting Group has reviewed the plan review comments and based on our meeting of <br />September 13,2018, we respectfully submit this proposal for additional services based on changes in <br />scope of the project. A portion of the County identified work is constructability review .comments and <br />will be handled at no additional charge. However, a portion of the work involves a change in scope and <br />we are requesting additional compensation for this work. This proposal covers the additional work that <br />Bowman and Lassiter Transportation Group will perform. No other subconsultants are involved with <br />this request. <br />We received a list of comments from the County and have reviewed the list, sorted and combined the <br />comments that result in additional services, where applicable. This list was reviewed with the County to <br />assure we understood the scope of work required to be performed and to see if there were things that <br />could be done to streamline the work and reduce cost. The following list is for Bowman. Consulting only <br />and the proposed work to be performed by Lassiter is included in a separate proposal attached hereto. <br />SCOPE OF SERVICES <br />Item No. <br />Comment <br />Issue <br />10 <br />Update Util Details (3/18) <br />No charge <br />18 <br />Utility Coordination <br />We have sent out utility notices as a part of the contract. <br />Meeting <br />Some utilities never responded. <br />Adding meetings including coordinate, attend and <br />memorialize' <br />1 meeting, Engr 4hr <br />20 <br />Project Layout . <br />Requires modifying the phasing plan. We are closing <br />streets in sections to give the contractor the whole street <br />to work with due to reprofiling the street and changing <br />grades. Streets will be open to local traffic and emergency <br />vehicles. The County desires the 69th Street work to be <br />completed as early in the project as possible. <br />Phasing Plan only: Engr 2hrs + CAD 2hrs <br />22 <br />Silt Fence out of Clear <br />After review with the County it was determined the only <br />Zone <br />change to the SWPPP drawings is to remove the silt <br />4450 W. Eau Gallie Blvd., Suite 232, Melbourne, FL 32934 <br />
The URL can be used to link to this page
Your browser does not support the video tag.