My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-003
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 11:58:03 AM
Creation date
1/14/2019 4:38:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/08/2019
Control Number
2019-003
Agenda Item Number
8.F.
Entity Name
Morgan and Eklund (M&E)
Subject
Beach profile monitoring surveys for winter
Work order number 8
Area
Sector 3, Sector 7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41* <br />M&E <br />Morgan & Eklund, Inc. <br />Exhibit A <br />4909 US Highway 1 Phone: 772-388-5364 <br />Vero Beach, Florida 32967 Fax: 772-388-3165 <br />November 30, 2018 <br />(Revised December 7, 2018) <br />Indian River County <br />Attn: Mr. James Gray, Jr. <br />Coastal Engineer <br />1801 27th Street, Building A <br />Vero Beach, FL 32960 <br />RE: 2019 Winter Semi -Annual Indian River County Coastal Monitoring Survey; <br />Onshore/Offshore Profiles along FDEP Range Lines R-15 to R-119 together with <br />Sector 7 Project Lines <br />Dear James: <br />Morgan & Eklund, Inc. is pleased to provide you with the following proposal to furnish <br />professional land and hydrographic survey services for the above referenced project. <br />Beach profiles will include R-15 through R-119 together with the intermediate lines for Sector 7, <br />a total of 124 beach profile lines. All data collected will be in accordance with the FDEP- <br />approved Physical Monitoring Plan. Morgan & Eklund, Inc. will provide the County with beach <br />profile data in ASCII file format together with AutoCAD drawings signed by the surveyor. The <br />survey will be performed in January/February 2019 with drawings and reports completed in <br />April 2019. <br />Additionally, the landward occurrence of rock outcroppings will be identified along each profile <br />line. <br />In accordance with the scope of work as provided, I estimate our costs to be as follows: <br />I. Winter 2019 Sector 3 Beach and Dune Restoration Project Monitoring Survey <br />(R-15 to R-60) <br />46 Onshore/offshore <br />profile lines @ $550/line $ 25,300.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.