My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-012
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:03:53 PM
Creation date
1/16/2019 12:15:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/15/2019
Control Number
2019-012
Agenda Item Number
15.B.3.
Entity Name
CDM Smith
Subject
Permit Compliance Assistance for 2019
Area
County Landfill
Project Number
CCNA2018WO3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection (FDEP) rules and the permit for the facility, the COUNTY reported the <br />exceedances of the MCLs to the FDEP in March 2017. Ina letter dated June 22, 2017, FDEP <br />requested that the COUNTY initiate evaluation monitoring in accordance with the requirements of <br />Chapter 62-701.510(6), Florida Administrative Code (F.A.C.). In July2017, the COUNTY installed one <br />monitor well (MW -49S) and performed two quarterly sampling events (July 2017 and October <br />2017). <br />Monitoring wells MW -21S and MW -49S will be sampled quarterly in January 2019, April 2019, July <br />2019, and October 2019. The samples collected in January, April and July will be analyzed for the <br />parameters listed in Chapter 62-701.510(7)(a), F.A.C. The samples collected in October 2019 will be <br />analyzed for the parameters listed in Chapter 62-701.510(7)(c), F.A.C. <br />Title V Operation Permit Air Quality Compliance <br />The COUNTY Landfill also operates under a Title V permit (Permit No. 0610015 -005 -AV) effective <br />on June 1, 2017, which contains monitoring and reporting requirements related to the landfill gas <br />collection and control system. The COUNTY is required to prepare and submit the following to <br />FDEP and the U.S. Environmental Protection Agency (USEPA), Region 4: <br />• Annual Statement of Compliance (within 60 days after the end of the calendar year); <br />■ Electronic Annual Operating Report and Title V Emission Fee (on or before April 1 of the <br />following year); <br />• Semi -Annual Monitoring Report (target submittal dates on March 1 and August 29), and <br />• Results of an annual landfill gas sulfur content test (Annual Emissions Report for Sulfur Dioxide <br />letter report and included in the Electronic Annual Operating Report). <br />Effective December 31, 2013, the Major Air Pollution Source Annual Emissions Fee is calculated by <br />FDEP's Electronic Annual Operating Report (EAOR) application that is used to produce the Annual <br />Operating Report listed above. The emissions fee for 2018 is due by April 1, 2019. <br />SCOPE OF SERVICES <br />CONSULTANT will undertake the necessary annual permit compliance monitoring and reporting, <br />which will include the following tasks: <br />Task 1.0: Project Quality Management <br />Task 2.0: Semi -Annual Water Quality Sampling and Reporting <br />Task 3.0: Title V Permit Compliance and Reporting <br />Task 4.0: Evaluation Monitoring for the C&D Debris Disposal Facility <br />Task 5.0: General Technical and Miscellaneous Permit Compliance Reporting <br />The below Scope of Services is based on regulations and monitoring and reporting requirements as <br />of the authorization date of this Work Order. An amendment to this Scope of Services may be <br />needed if there are any regulatory changes that result in additional work. <br />TASK 1.0 - PROJECT QUALITY MANAGEMENT <br />Activities performed under this task consist of those generally administrative functions required to <br />assure that the project remains on schedule, within budget, and that the quality of the work <br />products defined within this scope is consistent with CONSULTANT's standards and the COUNTY's <br />expectations. <br />Smith <br />A-2 <br />jj2391_WO No. 3.docx , <br />
The URL can be used to link to this page
Your browser does not support the video tag.