My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-012
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:03:53 PM
Creation date
1/16/2019 12:15:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/15/2019
Control Number
2019-012
Agenda Item Number
15.B.3.
Entity Name
CDM Smith
Subject
Permit Compliance Assistance for 2019
Area
County Landfill
Project Number
CCNA2018WO3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
submitted to FDEP in a letter report after receipt of the laboratory test report. The landfill gas <br />sulfur content test will be completed no later than December 31, 2019. <br />TASK 4.0 - EVALUATION MONITORING FOR THE C&D DEBRIS DISPOSAL FACILITY <br />CONSULTANT, using Ideal Tech Services, Inc. (ITS) as a subcontractor, will perform the quarterly <br />sampling events for Calendar Year 2019 (January 2019, April 2019, July 2019 and October 2019) <br />for MW -21S and MW -49S. The samples collected in January, April and July will be analyzed for the <br />parameters listed in Chapter 62-701.510(7)(a), F.A.C. The samples collected in October 2019 will be <br />analyzed for the parameters listed in Chapter 62-701.510(7) (c), F.A.C. The January 2019 and July <br />2019 events will be performed concurrently with the routine groundwater monitoring scheduled <br />for late January and July 2019. CONSULTANT/ITS will coordinate with and deliver samples to <br />COUNTY'S contract analytical laboratory. ENCO will perform the laboratory analysis under <br />COUNTY'S contract. <br />CONSULTANT will prepare an Evaluation Monitoring Report for each of the four quarterly <br />monitoring events. Draft reports will be submitted to the COUNTY for review and comment. The <br />reports will be finalized and submitted to FDEP after resolution of COUNTY comments. The reports <br />will be letter reports. <br />In the event that FDEP requires changes to the monitoring and reporting requirements as a result <br />of the Contamination Evaluation Report that is being prepared under a separate work order, the <br />additional services will be performed under Task 5 below. <br />TASK 5.0 - GENERAL TECHNICAL AND MISCELLANEOUS PERMIT COMPLIANCE REPORTING <br />CONSULTANT will provide general technical and permit compliance assistance to COUNTY staff on <br />an as needed basis. COUNTY staff is performing a number of the tasks required annually by the <br />current FDEP landfill permits. CONSULTANT will provide support as needed for the COUNTY staff <br />as they perform these tasks. <br />General technical and permit compliance assistance tasks may include: <br />• Reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br />• Quarterly monitoring and reporting of the landfill gas monitoring wells located at the COUNTY; <br />Landfill site boundary, as well as enclosed structures located on site; <br />• Preparing agenda items for and attending Board of County Commissioners meetings; <br />• Developing annual COUNTY budgets; <br />• Miscellaneous permit renewals or technical support; <br />• Install one piezometer for Segment 3 Cell 2; <br />• Sampling and reporting for up to six additional C&D monitoring wells dependent on FDEP <br />review of the Contamination Evaluation Report, and <br />• Sampling and reporting for additional monitor wells, surface water, leachate, etc. <br />ASSUMPTIONS <br />• This Scope of Services and cost proposal is based on solid waste operations Permit Nos. <br />0128769 -022 -SC and 0128769 -023 -SO for the Class I landfill and the WQMP included as <br />Appendix 3 of Permit No. 0128769 -025 -SO -24 dated July 13, 2017 for the C&D debris disposal <br />facility. <br />• Laboratory analysis is not included in this Work Order. <br />• This Work Order is based on the Title V Permit No. 0610015 -005 -AV (effective June 1, 2017), <br />which is the current permit as of the date of this Work Order and expires on June 1, 2022. Title <br />Smith <br />A-5 <br />jj2391_WO No. 3.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.