My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-016
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:04:23 PM
Creation date
1/24/2019 3:30:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2019
Control Number
2019-016
Agenda Item Number
8.G.
Entity Name
Bowman Consulting Group
Subject
Indian River Club Reclaimed Distribution System Analysis
CCNA2018 Work Order 01
Area
Indian River Club Subdivision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A -SCOPE OF WORK <br />Alternatives Analysis — Task 1 <br />Project Permitting <br />1. Evaluate existing Indian River South Regional Wastewater Treatment Facility (SRWWTF) <br />FDEP Operating Permit for required permit modifications for this use including discharge <br />point and monitoring wells. <br />2. Evaluate Indian River Club SJRWMD ERP to determine required permit modifications <br />including nitrogen and phosphorus levels. <br />3. Evaluate IRFWCD permit (Indian River Club) criteria for discharge requirements. <br />4. Summarize permitting issues and findings and determine the constraints on proposed <br />system alternatives. <br />System Evaluation <br />5. Evaluate existing reclaimed pump station operation so proposed alternative systems can <br />be integrated with it. Evaluate station hydraulics and control system. Evaluate storage <br />requirements for the ponds and pressurized system alternative. <br />Confirm required control system for reclaimed water system operations for both open <br />discharge and pressurized reclaimed systems. <br />7. Evaluate pond configuration and location for onsite and offsite alternatives. Coordinate <br />with SRWWTF and Indian River Club for location and configuration. <br />8. Evaluate the Indian River Club irrigation pump station as it relates to a pressurized <br />reclaimed water system. <br />9. Evaluate the potential for additional users of reclaimed water for the pressurized system <br />alternative. <br />Letter Report of Findings <br />10. Evaluate three alternatives for delivering reclaimed water. a) evaluate delivering <br />reclaimed water to a dedicated pond to be located on Indian River Club property, b) <br />evaluate delivering reclaimed water to a dedicated pond located on SRWWTF property <br />with support and separate delivery to their pump station, c) evaluate a pressurized system. <br />11. Develop engineer's opinion of construction cost for each alternative. <br />12. Develop Summary of recommendations <br />13. Attend and prepare summary meeting notes for (3) Project meetings and site evaluations <br />as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.