My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-016
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:04:23 PM
Creation date
1/24/2019 3:30:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/22/2019
Control Number
2019-016
Agenda Item Number
8.G.
Entity Name
Bowman Consulting Group
Subject
Indian River Club Reclaimed Distribution System Analysis
CCNA2018 Work Order 01
Area
Indian River Club Subdivision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Staff Loading For: <br />Indian River Co. - Reclaimed Water Line Alternatives <br />1/2/2019 <br />TASK Sr Proj Mg Sr Engr Proj Engr <br />Engr <br />Sr Dsgnr <br />Clerical <br />TOTAL <br />Task 1 - Alternatives Analysis <br />0 <br />Project Permitting <br />0 <br />1. Evaluate FDEP Permit <br />1 <br />2 <br />6 <br />9 <br />2. Evaluate SJRWMD Permiting <br />1 <br />2 <br />8 <br />11 <br />3. Evaluate IRFWCD Permitting <br />1 <br />2 <br />3 <br />4. Summarize Permitting Issues <br />1 <br />4 <br />5 <br />0 <br />System Design <br />0 <br />5. Evaluate Exist P.S. system <br />4 <br />6 <br />12 <br />4 <br />26 <br />6. Evaluate Control Systems <br />2 <br />4 <br />6 <br />7. Evaluate Pond Configurations <br />4 <br />6 <br />8 <br />18 <br />8. Evaluate Indian River Club P.S. <br />1 <br />2 <br />4 <br />7 <br />9. Evaluate additional users <br />1 <br />4 <br />5 <br />0 <br />Letter Report <br />0 <br />10. Evaluate 3 Alternatives <br />6 <br />9 <br />18 <br />8 <br />41 <br />11. Develop Opinon of Costs <br />4 <br />4 <br />8 <br />12. Summary of Recommendations <br />2 <br />4 <br />6 <br />8 <br />20 <br />13. Project Meetings (3), Onsite <br />6 <br />4 <br />12 <br />22 <br />0 <br />0 <br />0 <br />0 <br />Staff By Category Totals <br />23 <br />40 <br />90 <br />0 <br />28 <br />0 <br />181 <br />Biting Rate ($/hr) <br />$165 <br />$150 <br />$130 <br />$100 <br />$105 <br />$50 <br />Total Personnel Cost ($) <br />$3,795 <br />$6,000 <br />$11,700 <br />$0 <br />$2,940 <br />$0 <br />$24,435 <br />Staffing Ratio (% of total hrs) <br />12.7 <br />22.1 <br />49.7 <br />0.0 <br />15.5 <br />0.0 <br />Average Personnel Cost ($/hr) <br />135.00 <br />Description of Other Project Costs <br />VALUE ($) <br />Repro/Misc @ 5% <br />$1,222 <br />Total of other costs ($) <br />$1,222 <br />Total Estimated Project Cost ($) <br />$25,657 <br />
The URL can be used to link to this page
Your browser does not support the video tag.