My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-007A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:01:44 PM
Creation date
2/1/2019 1:43:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/15/2019
Control Number
2019-007A
Agenda Item Number
8.H.
Entity Name
Aquatic Surfaces of the Treasure Coast
Subject
Gifford Aquatic Center Pool Resurfacing
Area
North County Pool
Bid Number
2019018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related <br />data identified in the Invitation to Bid documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, <br />and Site conditions that may affeccost, progress, and performance ofthe Work. <br />C. CONTRACTOR is famiflar with and is satisfied as to aU federal, state,and Iocal Laws and Regulations <br />that may affect cost, progressand performance ofthe Work. <br />D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or suppementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br />means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions arid programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the <br />Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />' Documents, and all additional examinations, investigations, explorations, tests,studies, and data <br />with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflictserrors, ambiguitiesor discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for perforrnance and furnishing ofthe Work. <br />ARTICLE 8- CONTRACT DOCUMENTS <br />8.01 Contents <br />A. The Contract Documents consist of the foUowing: <br />(1) This Agreement (pages 1 to 8, inclusive); <br />(2) Notice to Proceed; <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.