Laserfiche WebLink
and attend a pre-application/site meeting with FDEP staff as suggested in their notice of <br /> permit renewal. <br /> Consultant will prepare all applicable applications to maintain the existing rated capacity. <br /> Application forms including 62-620.910(1) and 2DC 62-620.910(18) forms will be <br /> prepared and submitted along with supporting tables, graphs, and process flow diagram. <br /> Consultant will update the existing engineering report prepared for the previous up- <br /> rating. <br /> Consultant will prepare a list of data and documentation needed for the preparation of the <br /> permit renewal application. Information such as background water quality data, <br /> treatment plant water quality, MOR's, daily plant flow data, non-compliance notices, <br /> historical concentrate water characteristic data, etc., as a minimum, will be provided by <br /> IRCU for use in preparing the permit application. <br /> The following parameters are included as part of the existing operating permit and will be <br /> reviewed as part of the permit application. Several of these parameters are measured at <br /> multiple locations within the ATS treatment system. Where practical and if desired, the <br /> frequency and/or elimination of testing will be requested in the permitting process. <br /> • Flow Chlorine <br /> • pH Temperature <br /> • Phosphorus (Total) CBOD5 (removed from testing) <br /> • Nitrogen (Total) Mercury <br /> • Ammonia Nitrogen Copper <br /> • • Hydrogen Sulfide Gross Alpha <br /> • Dissolved Oxygen Radium 226/228 <br /> • Fluoride Fecal coliform (removed from testing) <br /> • Conductivity (Salinity) Acute Toxicity (Daphnia water fleas, fathead <br /> minnows) <br /> Consultant will rely on the calculations for Total Daily Mass Load (TMDL) and ATS <br /> system performance as outline in the permit. <br /> A condition of the permit allows a reduction in monitoring frequency of acute toxicity to <br /> every six months, which Consultant will review as part of the permit renewal, if the data <br /> supports this request. <br /> Consultant will prepare a draft application with supporting tables, graphs,trends, and <br /> explanation's to the permit application renewal and submit draft copies to IRCU staff for <br /> review one month prior to submittal deadline. Consultant will attend a review meeting to <br /> discuss the draft application and supporting information, and revise the permit application <br /> based on comments developed in review meeting. <br /> It is assumed that only minor adjustments to the best management plan and standard <br /> operating protocols will need to be provided, and Consultant will update the existing Best <br /> K:\WPB_Civil\044572030-IRCU Oncall\Scope\South County Demineralization Permit Renewal 2016 REV2,docx <br /> Page 2 of3 <br />