Laserfiche WebLink
AACE 2018-2021 Fee Schedule <br />CONCRETE SAMPLING AND TESTING (Int an Rrve r Couno) <br />Compressive Strength Samples of normal weight concrete (ASTM C-31) .............. 588.00/set <br />Includes: sampling (ASTM C-172), Slump (ASTM C-143) <br />Temperature (ASTM C-1064), Molding (ASTM C-31) <br />Curing & Testing (ASTM C-39) for 1 Set of Four Test Cylinders. <br />Additional cylinders (more than 4 per set) ...................................... 520.00/cyl. <br />Additional slump tests (more than 1 per set) ....................................... 515.00/ea. <br />Compressive strength of CMU:grout Samples (ASTM C-1019): ................... 588.00/set <br />Includes, Slump if requested, Temperature and Molding <br />1 Set of Four Grout Prisms <br />Technician Standby time due to construction delays <br />in excess of 1.0 hour per set of cylinders/prisms ..... 559.00/hr. <br />Sample pick-up if not scheduled with other work ................................. 559.00/set <br />Curing and strength testing of concrete samples F.O.B.our laboratory (ASTM C-39):... 520.00/cyl. <br />Continuous monitoring of concrete placement ................................... 559.00/hr. <br />Air Content by Volumetric Method (ASTM C-173) .............................. $35.00/test <br />Air Content by Pressure Method (ASTM C-231) ................................ 545.00/test <br />Unit Weight and Yield (ASTM C-138) .......................................... 545.00/ea. <br />Fineness Modulus ........... ..............................................$55.00/ea. <br />Concrete blocks (ASTM C-140) <br />Strength tests (gross area basis) ........................................ 545.00/block <br />Strength tests (net area basis) .......................................... 575.00/block <br />Absorption .................................................. ...... 530.00/block <br />Masonry Mortar — 2" x 2" cubes molded at site (3 per set) .......................... 590.00/set <br />SAWPLING AND TESTING OF IN-PLACE CONCRETE <br />Core samples <br />Mobilization........................................................ 5100.00/day <br />Technician time (2 man crew) ........................... .......... 559.00/man-hr. <br />Core machine....................................................... 5150.00/day <br />Generator (if required) .................................................. 550.00/day <br />Diamond bit wear - per inch diameter per inch length ....................... 50.35/in/in <br />Sample preparation (Measuring, Trimming & Capping)....... ............ $ 35.00/core <br />Compressive Strength tests ....... ...................... .......... 520.00/core <br />Andersen Andre Consulting Engineers, Inc. • 834 SW Swan Avenue, Port St. Lucie, FL 34983 0 <br />Ph. (772) 807-9191 • www.aaceinc.com OContact: David Andre, P.E. dandrepaaceinc.com <br />Page 2 of 5 103 <br />