Laserfiche WebLink
f <br />Ardaman & Associates, Inc. <br />Geotechnical, Environmental and <br />Materials Consultants <br />G <br />EXHIBIT "l <br />ARDAMAN & ASSOCIATES, INC. <br />FEE SCHEDULE <br />INDIAN RIVER COUNTY <br />460 NW Concourse Place, Unit 1 <br />Port St. Lucie, Florida 34986 <br />772-878-0072 (office) <br />772-878-0097 (fax) <br />www.ardaman.com <br />GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br />AND CONSTRUCTION MATERIALS TESTING SERVICES <br />(Effective 2018 - 2021) <br />REMEDIATION EQUIPMENT: <br />Sy Cost is based on type of equipment and duration of project. Cost to be determined on project by project basis. <br />a� MONITORING WELL INSTALLATION <br />Temporary 2 -inch PVC Wellpoint (Piezometer))..................................................................................................$18.00/foot <br />?aa 2 -inch PVC.........................................................................................................................................................:$35.00/foot <br />VAULVPAD INTALLATION — MONITORING WELLS <br />Well Size <br />2 -inch PVC..................................................:..........:....................................................................................... <br />$275.00/well <br />4 -inch PVC.............................................................::..............:....................................................................... $380.00/well <br />Aboveground riser w/pad................................................................................................................................ <br />$275.00/well . <br />DIRECT PUSH GROUNDWATER SAMPLING <br />Direct Push Sampler (minimum 1 day)......................................................................:....................................$1,500.00/day <br />ENGINEERING (HOURLY RATES) <br />Data Evaluation, Engineering Analysis, Design, Inspections, Field Monitoring, etc. <br />PrincipalEngineer.........................:....................:.........................:.................................................................. $140.00/hour <br />Senior Project Engineer (P.E. / Branch Manager).............................................................................:.............. $115.00/hour <br />ProjectEngineer................................................................................................................................................ <br />$95.00/hour <br />StaffEngineer.......................................................... :......................................................................................... <br />$85.00/hour <br />CONSTRUCTION MONITORING AND FIELD TESTING (HOURLY RATES) <br />SeniorField Technician..................................................................................................................................... <br />$55.00/hour <br />FieldTechnician................................................................................................................................................ <br />$50.00/hour <br />Senior Asphalt Plant Inspector ........................................ :....................................... :......................................... <br />$95.00/hour <br />CertifiedWeld Inspector........................................................... :...................................................................... <br />$125.00/hour <br />SeniorSteel Inspector ............... ...:...................................................................................... :........................... <br />$145.00/hour <br />SUPPORT PERSONNEL (HOURLY RATES) <br />SeniorTechnical Draftsman......................................................................................:......................................: <br />$55.00/hour <br />TechnicalDraftsman I........................................................................................................................................ <br />$50.00/hour <br />TechnicalSecretary .... :...................................................................................................................................... <br />$50.00/hour <br />OVERTIME AND HOLIDAY <br />Charges will be increased 50% for work performed during weekends and official holidays. <br />SUB -CONTRACTING SERVICES <br />Cost Plus 15% <br />Please call if you have any questions or require additional information. <br />Sincerely, <br />ARDAMAN & ASSOCIATES, INC. <br />GCan_J rallack, P.E. <br />Branch Manager <br />117 <br />460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 5 of 5 <br />