Laserfiche WebLink
club user fees, general fund loan, Windsor fund, Fairgrounds improvement fund, 16 1h Street Ballfield <br />sale funds, and impact fees. The expenditures within this category for fiscal years 2018/19 through <br />2022/23 total $9,803,718, representing 2.92% of the overall CII'. <br />As listed within Appendix A, facilities management capital improvements projects represent 5.38% <br />of the overall CIP for fiscal years 2018/19 through 2022/23 and total $18,059,182. Those projects <br />include improvements such as the construction of new courtroom facilities, acquisition of land for <br />future buildings, and costs for replacement of various county building roofs. The projects will be <br />funded through various sources, including: one cent local option sales tax revenue, half cent sales <br />tax, impact fees, and court facility surcharges. <br />Planned law enforcement and corrections capital improvements projects include development of <br />corrections medical housing and inmate laundry facilities, and a Sheriff Facility expansion needs <br />design. Those projects will be funded by impact fees and one cent local option sales tax revenue. The <br />total amount of expenditures for projects within this category for fiscal years 2018/19 through <br />2022/23 is $9,695,000, representing 2.89% of the overall CIP and representing an 86.08% increase in <br />cost over last year's law enforcement and corrections 5 year CIP. The increase relates to fully <br />funding the corrections medical housing project. <br />Within the next five years, there are potable water and sanitary sewer capital improvements projects <br />planned at various locations within the county. Projects planned for fiscal years 2018/19 through <br />2022/23 include construction of several water mains (new and replacement), North County septic to <br />centralized sewer conversions, meter conversions to an Advanced Metering Infrastructure (AMI) <br />system, and west/south waste water treatment facility improvements. The potable water and <br />wastewater projects will be funded through one cent local option sales tax, user fees, grants, <br />assessments, and capacity charges. The sanitary sewer and potable water category accounts for <br />19.42% of the overall CIP, or $65,209,250, during the five year CIP time period. <br />In the next five years, solid waste capital improvements will involve expansion of Cell II of Segment <br />3 of the landfill, a new single stream recycling building, new automated scale system, emergency <br />access roadways and fire protection improvements, and site drainage improvements at the landfill. <br />Those improvements total $9,900,000 during the five year CIP time period, account for 2.95% of the <br />overall CIP, and representing an 54.80% decrease in cost over last year's solid waste 5 year CIP. <br />The decrease relates to updated projections/costs for the future closure and expansion of landfill cells <br />which places those costs outside the range of the proposed 5 year CIP. Those projects that remain in <br />the proposed 5 year CII' will be funded by assessments and user fees. <br />For stormwater management, capital improvements include construction of a canal treatment system <br />in the North Relief Canal, upgrades to the main relief canal screening system, North and South Relief <br />Canal mechanical vegetation/debris removal, Osprey Acres Floway and Nature Preserve, and East <br />Gifford Stormwater Improvements. The stormwater management projects identified in Appendix A <br />will be paid for with one -cent local option sales tax revenue, grant funds, stormwater MSBU funds, <br />and Vero Lake Estates assessments. The expenditures within this category for fiscal years 2018/19 <br />4 <br />189 <br />