Laserfiche WebLink
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />West Wabasso Community Gravity Sewer System Phase 2 <br />ADDENDUM 2 <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the 15 day of January in the <br />year 2019 by and between Indian River County, a political subdivision of the State of Florida <br />(hereinafter called OWNER) and CK Contractors & Development .(hereinafter called <br />CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish <br />and complete all of the necessary labor, material, and equipment to perform the work <br />as specified or indicated in the Contract Documents and per FDEP, FDOT, Indian <br />County Department of Utility Services (IRCDUS) and County Engineering Department <br />standards. The work is generally described as follows: <br />IRCDUS proposes to construct a new 8" Gravity Sewer Collection System within <br />The Douglas Subdivision of West Wabasso. The facilities shall provide sewage <br />collection infrastructure to serve about one hundred and one (101) lots on CR 510, <br />64th Avenue, 84th Street, 84th Place, 63`d Court, 63rd Avenue and 62nd Avenue. The <br />gravity sewer main will consist of about 5,750 feet of 8" PVC gravity sewer, 22 <br />manholes, service laterals, and a new IRCDUS sanitary sewer lift station. The <br />Contractor shall also demolish all septic tanks on the lots to be connected to the <br />laterals per the DOH standards and requirements. The Contractor will direct <br />purchase and furnish the ABS pumps and electrical package for the lift station <br />which includes two pumps, lifting cables, guide rails, guide rail assemblies, float <br />hangar bracket, anchor bolts, lifting bales, upper guide brackets, SS nipples and <br />elbows, float switches, hatch covers for both the wet well and valve vault, duplex <br />control panel and spare parts set. The Contractor will install the furnished pumps <br />and all appurtenances required to make the lift station operational. The Contractor <br />will also direct purchase the Dataflow telemetry system and the Contractor will <br />install telemetry at the lift station and schedule Dataflow to program telemetry and <br />all necessary start-up features to make remote monitoring and operation of lift <br />station functional. Upon successful operation of lift station, Contractor shall <br />schedule a start-up with ABS to certify lift station has been installed in accordance <br />with manufacturer's requirements to affect warranty. No existing culverts are <br />proposed to be replaced. Any existing culverts damaged shall be restored to pre - <br />construction condition. <br />The construction of the utility improvements described above shall also consist of, <br />but not limited to: resetting of signs, mailboxes, and other existing facilities <br />disturbed during construction; utilities exploration; coordination with any permitting <br />agencies; trenching; clearing and tree removal; dewatering; installation of pipe, <br />structures and all appurtenances; soil backfill compaction; testing; (including T.V. <br />00530-1 <br />