Laserfiche WebLink
and no additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data are or will be required by CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing underground facilities at or contiguous to the <br />site and assumes responsibility for the accurate location of said underground facilities. No <br />additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said underground facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 4.04 of the General Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENGINEER is acceptable to CONTRACTOR. <br />ARTICLE 8 CONTRACT DOCUMENTS. <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 Schedule of Subcontractors (Section 00431). <br />8.3 Disclosure of Relationships (Section 00452). <br />8.4 Sworn Statement under the Florida Trench Safety Act (Section 00454). <br />8.5 General Information Required of Bidders (Section 00456). <br />8.6 Public Construction Bond (Section 00600). <br />8.7 Notice of Award and Notice to Proceed (examples in Section 00800). <br />8.8 General Conditions (Section 00700). <br />8.9 Supplementary Conditions (Section 00800). <br />8.10 Documents/Specifications bearing the title "West Wabasso Community Gravity <br />Sewer System- Phase 11 / Bid No 2019-020" <br />8.11 Addenda numbers 1 to 4 , inclusive. <br />8.12 CONTRACTOR'S Bid (Section 00300). <br />8.13 Specifications bearing the title "IRCDUS Water and Wastewater Utility Standards, March <br />2018", or the latest version thereof. <br />8.14 The following, which may be delivered or issued after the effective date of the Agreement and <br />are not attached hereto: All written amendments and other documents amending, modifying, <br />or supplementing the Contract Documents pursuant to Paragraphs 3.04 of the General <br />Conditions. <br />There are no Contract Documents other than those listed above in this Article 8. The Contract <br />Documents may only be amended, modified or supplemented as provided in Paragraphs 3.04 of the <br />General Conditions. <br />00530-6 <br />